Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bergen County
Provide turbine maintenance.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
New York State Thruway Authority
Provide monitoring, maintenance and repair services required for one individual northern power systems (northern power 100artic) 100kw wind turbine energy electrical power generation system, which shall include a wind turbine, nacelle, rotor (including hub and blades), generator, control system, full power converter, braking system, yaw system, tower, and supervisory control and data acquisition (scada) system.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
New York State Thruway Authority
Close: Dec 9, 2025
Provide monitoring, maintenance and repair services required for one individual northern power systems (northern power 100artic) 100kw wind turbine energy electrical power generation system, which shall include a wind turbine, nacelle, rotor (including hub and blades), generator, control system, full power converter, braking system, yaw system, tower, and supervisory control and data acquisition (scada) system.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University Of California San Diego
Provide troubleshooting, overhaul, and annual maintenance inspections. These services shall include all parts, materials, equipment, labor, and travel/accommodation necessary to complete the work. All replacement parts must be oem or equivalent, considering design, specifications, and metallurgy.
Posted Date
Oct 27, 2025
Due Date
Dec 5, 2025
Release: Oct 27, 2025
University Of California San Diego
Close: Dec 5, 2025
Provide troubleshooting, overhaul, and annual maintenance inspections. These services shall include all parts, materials, equipment, labor, and travel/accommodation necessary to complete the work. All replacement parts must be oem or equivalent, considering design, specifications, and metallurgy.
AvailableDLA Aviation
Provide 167 Ea turbine wheel, turbine, p/n 167464-100, NSN: 2835-01-282-7058. The required delivery is 512 days
Posted Date
Aug 18, 2025
Due Date
Dec 2, 2025
Release: Aug 18, 2025
DLA Aviation
Close: Dec 2, 2025
Provide 167 Ea turbine wheel, turbine, p/n 167464-100, NSN: 2835-01-282-7058. The required delivery is 512 days
AvailableDLA Aviation
0001 AA NSN: 2840-01-443-4088 NZ Disk, Turbine, Aircra The 3rd Stage Turbine Disk is one component of the 3rd Stage Rotor Assembly, which is a sub-assembly of the Fan Drive Turbine Module. Nickel Alloy 2 Ea.
Posted Date
Nov 3, 2025
Due Date
Dec 3, 2025
Release: Nov 3, 2025
DLA Aviation
Close: Dec 3, 2025
0001 AA NSN: 2840-01-443-4088 NZ Disk, Turbine, Aircra The 3rd Stage Turbine Disk is one component of the 3rd Stage Rotor Assembly, which is a sub-assembly of the Fan Drive Turbine Module. Nickel Alloy 2 Ea.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →