Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Arcadia
The City of Arcadia is seeking bids for street rehabilitation improvements on Baldwin Avenue, including concrete pavement, sidewalks, ADA ramps, and traffic control. The project requires labor, equipment, and materials for comprehensive street rehabilitation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Pueblo
Work consists of removal and replacement of asphalt, concrete sidewalk, and curb and gutter, the construction of new curb ramps, and other incidental items. Includes, 3,300 SF of remove asphalt; 3,319 SF of remove concrete; 2,309 SF of construct 7" reinforced concrete; 6,477 SF of construct 4" concrete; 1684 SF of construct 6" concrete; 910 LF of remove curb and gutter; 829 LF of construct curb and gutter; 17 TON of install class 6 base material (place and compact).
Posted Date
Oct 11, 2025
Due Date
Dec 3, 2025
Release: Oct 11, 2025
City of Pueblo
Close: Dec 3, 2025
Work consists of removal and replacement of asphalt, concrete sidewalk, and curb and gutter, the construction of new curb ramps, and other incidental items. Includes, 3,300 SF of remove asphalt; 3,319 SF of remove concrete; 2,309 SF of construct 7" reinforced concrete; 6,477 SF of construct 4" concrete; 1684 SF of construct 6" concrete; 910 LF of remove curb and gutter; 829 LF of construct curb and gutter; 17 TON of install class 6 base material (place and compact).
AvailableOrange Township Police Department
Avenue improvements.
Posted Date
Oct 22, 2025
Due Date
Dec 3, 2025
Release: Oct 22, 2025
Orange Township Police Department
Close: Dec 3, 2025
Avenue improvements.
AvailableCity of Liberty Lake
Construct improvements to the stormwater system along Sprague Avenue and Neyland Avenue, including approx 180' of new curb, three new stormwater structures and approx 200' of storm drainage piping.
Posted Date
Nov 10, 2025
Due Date
Dec 3, 2025
Release: Nov 10, 2025
City of Liberty Lake
Close: Dec 3, 2025
Construct improvements to the stormwater system along Sprague Avenue and Neyland Avenue, including approx 180' of new curb, three new stormwater structures and approx 200' of storm drainage piping.
AvailableCity and County of Honolulu
Environmental pollution control and maintenance; clearing and grubbing, including but not limited to removal of excess materials, demolition and removal of portion of irrigation system, and plastic landscape header; structure excavation and backfill, including but not limited to excavation for archaeological inventory survey as instructed by city's archaeologist, placement of aggregate base, filter fabric, and geogrid, in-place complete; concrete drainage channel, including but not limited to concrete slab-on-grade, reinforcing steel, stainless steel security bars, fiber reinforced plastic grating, stainless steel angles and fasteners and all other required appurtenances, in-place complete.
Posted Date
Sep 30, 2025
Due Date
Nov 25, 2025
Release: Sep 30, 2025
City and County of Honolulu
Close: Nov 25, 2025
Environmental pollution control and maintenance; clearing and grubbing, including but not limited to removal of excess materials, demolition and removal of portion of irrigation system, and plastic landscape header; structure excavation and backfill, including but not limited to excavation for archaeological inventory survey as instructed by city's archaeologist, placement of aggregate base, filter fabric, and geogrid, in-place complete; concrete drainage channel, including but not limited to concrete slab-on-grade, reinforcing steel, stainless steel security bars, fiber reinforced plastic grating, stainless steel angles and fasteners and all other required appurtenances, in-place complete.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis