Project generally consists of construction of a 9 million-gallon partially buried reinforced concrete potable water reservoir, valve vaults with motor actuated valves, chemical building, potable and non-potable water lines, associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work.
Backcountry Reservoir Project
zip
Santa Clarita Valley Water Agency
Construction of the pump station. The project generally consists of construction of a 7,200 SF building to serve as a potable water pump station with backup generator. The pump station includes but not limited to the suction and discharge headers, eight pump cans, four pumps, four motors, and associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work ("Work") as indication in the Contract Documents.
City of Vallejo
Construction of a new 6.0 Million Gallon AWWA D110 Type I, strand-wound, prestressed concrete reservoir and associated construction work.
City of Pendleton
Rehabilitate two welded steel water storage tanks: the 1.8-million-gallon Water Filtration Plant (WFP) Clearwell and the 1.1-million-gallon Southwest Reservoir. Work will include surface preparation, coating, removal and replacement of compromised materials, reinstallation of structural and operational components, sealing, and disinfection of tanks upon completion. The Clearwell project involves removal and replacement of baffling, repair or replacement of deteriorated steel and rafter supports, recoating of interior and exterior surfaces, resealing of foundations, and coordination with a structural engineer for material assessment.