Retrieving RFP details
Release
Close
City of Tulsa
Work consist of 1595 CY of excavation, 1019 sy of solid slab sodding, 15352 SY of cold mill pavement, 400 LF of combined curb an gutter, 721 SY of 4" concrete sidewalk, 354 SY of 6" concrete sidewalk, 7 EA of replacement of inlet grate, 11 EA of valve box adjust to grade, 16 EA of manhole adjust to grade, 115 LF of RCP 18" round. See attached file.
Arterial Street Maintenance for North Sheridan Road from E
Pine St
City of Tulsa
Non-arterial street maintenance.
Philadelphia Housing Authority
To create homeownership opportunities for households with incomes up to 120% of area median income (“AMI”). Seeks development partners to build workforce homeownership housing on vacant parcels at 139 E. Clearfield, Abbottsford Homes and 1400-20 N 8th Street for a minimum of sixty-six (66) units between the three (3) sites. These homeownership opportunities are for households with incomes up to 120% AMI. 139 E. Clearfield is approx. a 20-minute drive to Center City or a 35-minute ride via SEPTA. As part of this project, a total of thirteen (13) units shall be vertically constructed, which will be comprised of thirteen (13) three-bedroom townhomes with basements of approx. 1,400 SF.
City of Tulsa
Rehabilitation of non-arterial street maintenance. Including 689 CY aggregate base Type A; 1,126 SY subgrade method B; 1,945 SY separator fabric; 3,894 SY fabric reinforcement, glass pave25; 436 ton superpave, Type S4(PG 64-22)(InSoluble); 218 ton superpave, Type S6 (PG 64-22); 3,894 SY cold mill pavement; 21 CY class A concrete; 1,,631 LB reinforcing Steel; 400 LF 2'-2" combined curb and gutter(6" barrier); 126 SY of 4" concrete sidewalk; 429 SY of 6" concrete driveway; 336 LF RCP, 15" round,, complete in place; 1 ea of 6'-dia, manhole, complete in place; 117 LF of 6" DIP, CL 54 polyethylene wrapped, (RFJ); 773 LF of 6" DIP, CL 54 polyethylene wrapped; 117 LF of 6" PVC, AWWA C900, Class 200, DR-14, (RJ); 773 LF of 6" PVC, AWWA C900, Class 200, DR-14; 890 of 8" HDPE, AWWA C906, PE4710, DR-11, (DIPS). See attached file.
Port Of Seattle
to provide information regarding 188th St Tunnel Electrical and Mechanical Maintenance Services for the Port at the Seattle-Tacoma International Airport (STIA).
Release
-
Close
Oct 31, 2025