Retrieving RFP details
Release
Close
City of Tulsa
Provide arterial street maintenance. Work includes clearing and grubbing; 1,595 CY of unclassified excavation; 1,019 SY of solid slab sodding; 677 CY of type A aggregate base; 15,352 SY of cold mill pavement; 400 LF of combined curb and gutter; 721 SY of 4" concrete sidewalk; 354 SY of 6" concrete driveway; 115 LF of 18" round RCP complete in place; pavement markings; 175 LF of 1" PVC sch 40 plastic conduit (trenched); 1,933 LF of 1.5" PVC SCH. 40 plastic conduit (bored); 147 LF of 1.5" PVC SCH. 40 plastic conduit (trenched); signage. See attached files.
City of Tulsa
Non-arterial street maintenance.
Philadelphia Housing Authority
To create homeownership opportunities for households with incomes up to 120% of area median income (“AMI”). Seeks development partners to build workforce homeownership housing on vacant parcels at 139 E. Clearfield, Abbottsford Homes and 1400-20 N 8th Street for a minimum of sixty-six (66) units between the three (3) sites. These homeownership opportunities are for households with incomes up to 120% AMI. 139 E. Clearfield is approx. a 20-minute drive to Center City or a 35-minute ride via SEPTA. As part of this project, a total of thirteen (13) units shall be vertically constructed, which will be comprised of thirteen (13) three-bedroom townhomes with basements of approx. 1,400 SF.
City of Tulsa
Rehabilitation of non-arterial street maintenance. Including 689 CY aggregate base Type A; 1,126 SY subgrade method B; 1,945 SY separator fabric; 3,894 SY fabric reinforcement, glass pave25; 436 ton superpave, Type S4(PG 64-22)(InSoluble); 218 ton superpave, Type S6 (PG 64-22); 3,894 SY cold mill pavement; 21 CY class A concrete; 1,,631 LB reinforcing Steel; 400 LF 2'-2" combined curb and gutter(6" barrier); 126 SY of 4" concrete sidewalk; 429 SY of 6" concrete driveway; 336 LF RCP, 15" round,, complete in place; 1 ea of 6'-dia, manhole, complete in place; 117 LF of 6" DIP, CL 54 polyethylene wrapped, (RFJ); 773 LF of 6" DIP, CL 54 polyethylene wrapped; 117 LF of 6" PVC, AWWA C900, Class 200, DR-14, (RJ); 773 LF of 6" PVC, AWWA C900, Class 200, DR-14; 890 of 8" HDPE, AWWA C906, PE4710, DR-11, (DIPS). See attached file.
Port Of Seattle
to provide information regarding 188th St Tunnel Electrical and Mechanical Maintenance Services for the Port at the Seattle-Tacoma International Airport (STIA).
Release
Sep 26, 2025
Close
Oct 31, 2025