Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the construction of removal and replacement of existing bituminous track surfacing and associated painting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Resurfacing, Restoration and Rehabilitation (RRR) including leveling/base repair improvements for the Walking Track and northwest parking area. The bituminous asphalt walking track is 8' wide and ±2,200 LF in length - 1,956 SY. The northwest car parking is 1,260 SY and will include striping and marking. 161 Gal tack coat, 19 SY 1" milling/planing existing asphalt.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Resurfacing, Restoration and Rehabilitation (RRR) including leveling/base repair improvements for the Walking Track and northwest parking area. The bituminous asphalt walking track is 8' wide and ±2,200 LF in length - 1,956 SY. The northwest car parking is 1,260 SY and will include striping and marking. 161 Gal tack coat, 19 SY 1" milling/planing existing asphalt.
Premium
Access the largest public sector contact database
Seeks qualified contractors to provide resurfacing services for running track and tennis courts. Work includes surface cleaning, crack repair, patching, resurfacing, and line striping per NFHS and USTA standards. Detailed technical specifications, materials, warranties, and performance requirements are provided in this RFP. Term of Contract/Option to Renew: Any contract resulting from this RFP shall have an initial contract period of one (1) year beginning Febuary 1, 2026 through January 31, 2027. The District, at its discretion, may extend the contract for four (4) additional periods of one (1) year each, with an option of an additional two (2) periods of one (1) year each with Superintendent's approval. Contracts exceeding seven (7) years must be approved by the school board.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
Seeks qualified contractors to provide resurfacing services for running track and tennis courts. Work includes surface cleaning, crack repair, patching, resurfacing, and line striping per NFHS and USTA standards. Detailed technical specifications, materials, warranties, and performance requirements are provided in this RFP. Term of Contract/Option to Renew: Any contract resulting from this RFP shall have an initial contract period of one (1) year beginning Febuary 1, 2026 through January 31, 2027. The District, at its discretion, may extend the contract for four (4) additional periods of one (1) year each, with an option of an additional two (2) periods of one (1) year each with Superintendent's approval. Contracts exceeding seven (7) years must be approved by the school board.
AvailablePartial re-roof project consists of partial re-roofing on two schools to remove existing fully adhered EPDM roof membrane, any wet insulation and all perimeter membrane and metal flashing and install new 2 thick screw fasten roof insulation, 1/2" thick high density polyisocyanurate cover board fastened with low rise foam adhesive and fully adhered epdm 90 mil roof membrane and new prefinished metal roof edge flashing for approximately 10,500 SF of roof area. Also provide miscellaneous standing seam metal roofs and metal soffit repairs as both schools and replace of (7) translucent fiberglass skylights.
Posted Date
-
Due Date
Dec 17, 2025
Release: -
Close: Dec 17, 2025
Partial re-roof project consists of partial re-roofing on two schools to remove existing fully adhered EPDM roof membrane, any wet insulation and all perimeter membrane and metal flashing and install new 2 thick screw fasten roof insulation, 1/2" thick high density polyisocyanurate cover board fastened with low rise foam adhesive and fully adhered epdm 90 mil roof membrane and new prefinished metal roof edge flashing for approximately 10,500 SF of roof area. Also provide miscellaneous standing seam metal roofs and metal soffit repairs as both schools and replace of (7) translucent fiberglass skylights.
AvailablePartial re-roof project consists of partial re-roofing on two schools to remove existing fully adhered EPDM roof membrane, any wet insulation and all perimeter membrane and metal flashing and install new 2 thick screw fasten roof insulation, 1/2" thick high density polyisocyanurate cover board fastened with low rise foam adhesive and fully adhered epdm 90 mil roof membrane and new prefinished metal roof edge flashing for approximately 10,500 SF of roof area. Also provide miscellaneous standing seam metal roofs and metal soffit repairs as both schools and replace of (7) translucent fiberglass skylights.
Posted Date
-
Due Date
Dec 17, 2025
Release: -
Close: Dec 17, 2025
Partial re-roof project consists of partial re-roofing on two schools to remove existing fully adhered EPDM roof membrane, any wet insulation and all perimeter membrane and metal flashing and install new 2 thick screw fasten roof insulation, 1/2" thick high density polyisocyanurate cover board fastened with low rise foam adhesive and fully adhered epdm 90 mil roof membrane and new prefinished metal roof edge flashing for approximately 10,500 SF of roof area. Also provide miscellaneous standing seam metal roofs and metal soffit repairs as both schools and replace of (7) translucent fiberglass skylights.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis