Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Northern Virginia Community College
Renovation of the automotive lab space in building a at the nvcc campus.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Northern Virginia Community College
Renovation to the existing al ae automotive welding lab & paint booth in building b. Work includes the renovation of existing spaces at the nvcc alexandria campus.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Northern Virginia Community College
Close: Dec 9, 2025
Renovation to the existing al ae automotive welding lab & paint booth in building b. Work includes the renovation of existing spaces at the nvcc alexandria campus.
AvailablePCAC Health Information (36C776)
AE services required shall be multidisciplinary in nature to include but not limited to civil and structural engineering & estimating. 1. Concept and scope development. 2. Investigations, Assessments, and Feasibility studies. 3. Space planning. 4. Environmental studies. 5. Program analysis. 6. Schematic design. 7. Pre-construction document technical investigation and studies. 8. Design, drafting, and planning services for renovation, demolition and alterations to existing facilities, interior design, and space planning; AE services required are Engineering and Structural Analysis. The potential project requires engineering services for commercial or industrial type facilities, vertical/horizontal construction, pavements and roads, and other hospital related structures. Standard services, in addition to those inherent to the project requirements are (but not limited to): Provide professional engineering services as required for the inspection, analysis, and preparation for the project.
Posted Date
Oct 31, 2025
Due Date
Nov 24, 2025
Release: Oct 31, 2025
PCAC Health Information (36C776)
Close: Nov 24, 2025
AE services required shall be multidisciplinary in nature to include but not limited to civil and structural engineering & estimating. 1. Concept and scope development. 2. Investigations, Assessments, and Feasibility studies. 3. Space planning. 4. Environmental studies. 5. Program analysis. 6. Schematic design. 7. Pre-construction document technical investigation and studies. 8. Design, drafting, and planning services for renovation, demolition and alterations to existing facilities, interior design, and space planning; AE services required are Engineering and Structural Analysis. The potential project requires engineering services for commercial or industrial type facilities, vertical/horizontal construction, pavements and roads, and other hospital related structures. Standard services, in addition to those inherent to the project requirements are (but not limited to): Provide professional engineering services as required for the inspection, analysis, and preparation for the project.
AvailableUnited States Department of Veterans Affairs Police
Provide renovate bldg 143 4j shower floors. The Contractor shall remove the existing flooring in all 20 bathrooms in Building 143, 4 th floor, Area J.Install a new waterproof membrane and tile flooring with a threshold/barrier-free design that ensures proper drainage to the existing drain locations. See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
United States Department of Veterans Affairs Police
Close: Dec 16, 2025
Provide renovate bldg 143 4j shower floors. The Contractor shall remove the existing flooring in all 20 bathrooms in Building 143, 4 th floor, Area J.Install a new waterproof membrane and tile flooring with a threshold/barrier-free design that ensures proper drainage to the existing drain locations. See attached file.
AvailableHawaii Department of Land and Natural Resources
Renovation of existing warehouse space into laboratory facilities per attached drawings (Sheets A1βA6); Installation of plumbing, electrical, and split air-conditioning systems; Installation of solar photovoltaic and battery storage system sized to sustain lab operations independently during power outages; Design, permit, and installation of a septic system with all necessary approvals; Connection to existing County water and 100-amp supplemental electrical service.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Hawaii Department of Land and Natural Resources
Close: Dec 19, 2025
Renovation of existing warehouse space into laboratory facilities per attached drawings (Sheets A1βA6); Installation of plumbing, electrical, and split air-conditioning systems; Installation of solar photovoltaic and battery storage system sized to sustain lab operations independently during power outages; Design, permit, and installation of a septic system with all necessary approvals; Connection to existing County water and 100-amp supplemental electrical service.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis