Retrieving RFP details
Release
Close
City of Palm Coast
Provide a turnkey installation of two (2) new 15-horsepower oilless air compressors in the ultrafiltration building at water treatment plant no. 2.
Air Compressors for Water Treatment Plant Process
zip
Miami-Dade County
The project involves cleaning the inside of water treatment plant pipelines that have become partially or fully blocked by water treatment byproduct materials. The work includes field locating, obtaining services of a pipe cleaning specialist, pressure jetting, using internal pipe cutters or a milling machine, and performing CCTV inspection. The project requires a minimum of three years of experience, and the bidder must have full-time personnel with the necessary experience to perform the scope of work. The project is located at the Hialeah Treatment Plant and the Preston Water Treatment Plant in Hialeah, FL.
Town of Bruceton
Project consists of replacing the existing high service pumps at the water treatment plant and providing SCADA and chlorine and turbidity monitoring capability.
City of Escanaba
Boiler replacement for water treatment plant.
Release
Oct 29, 2025
Close
Nov 20, 2025