Retrieving RFP details
Release
Close
Fairfax County
Project consists of gravity sewer improvements. See attached file.
Accotink Gravity Sewer Improvements
zip
Brunswick County
Installation of a long- side gravity sanitary sewer service. Work includes, but is not necessarily limited to, the following: 1 tap and install a four (4) inch sch 40 PVC gravity sewer service inclusive of clean out, piping, fittings, and appurtenances from the main to the property line. 2 establish traffic control during the performance of the work, ensuring measures are in place for safety and all compliance requirements. 3 contractor shall endeavor to minimize any disturbance to roadway, and any disturbance shall be restored as required to meet NCDOT and brunswick county requirements. See attached file for full scope.
City of Parsons
Project includes remove and replace approx. 9,000 LF of PVC gravity sewer line in the city, 35 EA manholes, 130 service reconnections, line approx. 1,970 LF of gravity sewer pipe, install approx. 270 LF of new sewer pipe, install approx. 1,580 LF of storm sewer pipe and other necessary appurtenances.
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
Release
Oct 10, 2025
Close
Nov 12, 2025