Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
North Dakota Department of Transportation
Work includes 747 LF removal of pipe all types and sizes, 33,232 cy common excavation-type a, 64,320 CY topsoil, 10,108 CY common excavation-waste, 42,601 CY borrow-excavation, 41. 920 acre seeding class ii 90. 630 acre soil stabilization, 15,332 LF silt fence, 6,918 gal tack coat. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Arizona Department of Transportation
The work consists of Pavement rehabilitation of the existing roadway and constructs turning lanes at various locations within the project limits. The works includes milling the existing travel lanes and shoulders and replacing it with Stone Matrix Asphalt Concrete, paving the existing unpaved turnouts and rehabilitate the existing turnouts, roadway widening for new turn lanes, remove and replace existing guardrail, shoulder buildup. The work also includes replacing the existing bridge barrier, box culvert extension, installing a new precast reinforced concrete box culvert, and sealing the bridge deck with methacrylate, pavement marking and other related works.
Posted Date
Aug 25, 2025
Due Date
Jan 9, 2026
Release: Aug 25, 2025
Arizona Department of Transportation
Close: Jan 9, 2026
The work consists of Pavement rehabilitation of the existing roadway and constructs turning lanes at various locations within the project limits. The works includes milling the existing travel lanes and shoulders and replacing it with Stone Matrix Asphalt Concrete, paving the existing unpaved turnouts and rehabilitate the existing turnouts, roadway widening for new turn lanes, remove and replace existing guardrail, shoulder buildup. The work also includes replacing the existing bridge barrier, box culvert extension, installing a new precast reinforced concrete box culvert, and sealing the bridge deck with methacrylate, pavement marking and other related works.
AvailableIndiana Department of Transportation
Construction of auxiliary lanes, accel and decel or turn lanes. Work includes clearing right of way; 1,850 CY of common excavation; stormwater management; 95 SY of 1 1/2" asphalt milling; 8,800 LF of joint adhesive; 1,681 LF of video inspection for pipe; 1 Ea type C4 manhole; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Construction of auxiliary lanes, accel and decel or turn lanes. Work includes clearing right of way; 1,850 CY of common excavation; stormwater management; 95 SY of 1 1/2" asphalt milling; 8,800 LF of joint adhesive; 1,681 LF of video inspection for pipe; 1 Ea type C4 manhole; signage; pavement markings. See attached files.
AvailableMichigan Department of Technology, Management and Budget
0.33 mi of addition of left turn lanes and pavement markings on US-12 at Beebe Road and Adamsville Road.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Michigan Department of Technology, Management and Budget
Close: Dec 5, 2025
0.33 mi of addition of left turn lanes and pavement markings on US-12 at Beebe Road and Adamsville Road.
AvailableKentucky Transportation Cabinet
Construct turn lanes
Posted Date
-
Due Date
Jan 29, 2026
Kentucky Transportation Cabinet
Close: Jan 29, 2026
Construct turn lanes
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis