Retrieving RFP details
Release
Close
City of Kent
Improve sidewalks and roadways including storm drainage, illumination, flashing beacon, and other utility work includes 130 LF saw cut existing cement concrete pavement, 105 LF ductile iron storm sewer pipe 12" diameter class 50 unlined, 60 tons crushed surfacing top course 5/8" minus, 840 LF supply and install 4" diameter schedule 80 PVC conduit.
83rd Avenue South and 132nd Avenue Southeast Sidewalk Improvements
zip
City of Asbury Park
Project includes reconstruction of the roadway, construction and replacement of concrete curb and sidewalk, ADA upgrades, and replacement of drainage and sanitary sewer infrastructure on portions of Third Avenue, as well as all other Work.
Village of Nyack
Drainage Improvements. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff. The scope of work for the project includes the construction of drainage improvements, including pipe, catch basins and manholes, on High Avenue and continuing south onto N Franklin Street. Concrete curb and concrete driveway aprons will be removed and replaced, and the road will be milled and paved. The limits will be marked in the field. The approximate scope of work for the major items for the Base Bid for this project includes 1230 LF 24-inch HDPE, 48 LF 19 x 30 elliptical pipe, 60 LF 15 inch HDPE, 6 catch basins, 1 manholes, 1050 LF concrete curb, 168 SY concrete driveway apron, 4245 SY milling, variable depth, leveling, 500 TONS paving, 2 inch thick top course, and pavements markings and striping and other associated work as needed for a complete, in place project. Traffic control will be performed by Village staff.
City of Pueblo
Removal and replacement of asphalt, concrete sidewalk, and curb and gutter, the construction of new curb ramps, and other incidental items
City of Wichita Falls
Project is generally described as paving and drainage improvements that generally include site clearing/preparation, construction/installation of approximately 11,500 SY (Base Bid = 8,050 SY & Additive Bid = 3,450 SY) of reinforced concrete pavement, drainage improvements, illumination facilities, striping, signage, water distribution improvements, and other associated work. 40 LF Furnish & Install Boring (No Casing) and a 10" PVC (C-900) Carrier Pipe; 2,050 LF Furnish & Install 10" PVC (C-900) Pipe including Tracer Wire;
Release
Oct 14, 2025
Close
Oct 28, 2025