Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lubbock
Approx. 100 LF 8" Wide Ditch 54" Deep (trench & backfill); 100 LF Excavation in Rock, 8" Wide Ditch 48" Deep, with 1- 2" Conduit with Cable; 500 LF 18" Wide Ditch 54" Deep, with 3-5" PVC Conduits; 750 LF Bore and lnstall 1-2" Plastic Conduit with Cable;
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lubbock Power & Light - Purchasing Dept.
Approx. 100 LF 8" Wide Ditch 36β Deep (trench & backfill); 100 LF Excavation in Rock, 8" Wide Ditch 36" Deep (trench & backfill); Excavation in Rock, 8" Wide Ditch 54" Deep, with 1- 2" Conduit with Cable; 750 LF Bore and lnstall 1-2" Plastic Conduit with Cable;
Posted Date
Nov 14, 2025
Due Date
Nov 25, 2025
Release: Nov 14, 2025
Lubbock Power & Light - Purchasing Dept.
Close: Nov 25, 2025
Approx. 100 LF 8" Wide Ditch 36β Deep (trench & backfill); 100 LF Excavation in Rock, 8" Wide Ditch 36" Deep (trench & backfill); Excavation in Rock, 8" Wide Ditch 54" Deep, with 1- 2" Conduit with Cable; 750 LF Bore and lnstall 1-2" Plastic Conduit with Cable;
AvailableCity of Lake Worth Beach
Work includes to install underground electrical conduits and pull cables on as needed basis, open trenching and directional boring for conduit sizes ranging from 2" to 8" in dia, supply materials (e.g., PVC and flexible conduits), manage traffic control, and restore work sites.
Posted Date
Oct 26, 2025
Due Date
Dec 4, 2025
Release: Oct 26, 2025
City of Lake Worth Beach
Close: Dec 4, 2025
Work includes to install underground electrical conduits and pull cables on as needed basis, open trenching and directional boring for conduit sizes ranging from 2" to 8" in dia, supply materials (e.g., PVC and flexible conduits), manage traffic control, and restore work sites.
AvailableOhio Department of Transportation
Provide jacking and boring services.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Ohio Department of Transportation
Close: Nov 20, 2025
Provide jacking and boring services.
AvailableRockford Public Schools
Rockford School District 205 is soliciting proposals for pupil transportation services under RFP No. 26-13. The RFP is open with submissions due by December 11, 2025 at 2:00β―PM CST; electronic submissions via Bonfire are not accepted, and bids must be mailed or dropped off.
Posted Date
Oct 27, 2025
Due Date
Dec 11, 2025
Release: Oct 27, 2025
Rockford Public Schools
Close: Dec 11, 2025
Rockford School District 205 is soliciting proposals for pupil transportation services under RFP No. 26-13. The RFP is open with submissions due by December 11, 2025 at 2:00β―PM CST; electronic submissions via Bonfire are not accepted, and bids must be mailed or dropped off.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis