Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Massachusetts Department of Transportation
Work includes approx 1,425 SY 127.4" full depth reinforced concreted deck excavation; 75 TN temporary asphalt patching; 20,000 LB steel reinforcement for structure - epoxy coated. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Massachusetts Department of Transportation
The work under this project shall consists of 1) Removing the deteriorated concrete from any element of the substructure, including but not limited to stem piers, pier caps, pier columns, wing walls, backwalls, and abutments. 2) Jacking and shoring to support pier caps and/or various beams over piers and abutments may be required to allow concrete repairs to the substructure. 3) Removing the deteriorated concrete from retaining walls, both connected/associated and not connected/not associated with any bridge in the jurisdiction of District 5. 4) Replacing excavated, spalled, delaminated, or deteriorated concrete, and replacing any broken, missing or deteriorated reinforcing steel with new material. 5) Removing and resetting or replacing bearing devices as required. 6) Replacing missing or damaged granite or cement concrete slope paving, either in kind or with cement concrete slope paving where needed and as directed by the Engineer. 7) Any additional repairs in either the superstructure or deck that are related to the substructure work.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Massachusetts Department of Transportation
Close: Dec 9, 2025
The work under this project shall consists of 1) Removing the deteriorated concrete from any element of the substructure, including but not limited to stem piers, pier caps, pier columns, wing walls, backwalls, and abutments. 2) Jacking and shoring to support pier caps and/or various beams over piers and abutments may be required to allow concrete repairs to the substructure. 3) Removing the deteriorated concrete from retaining walls, both connected/associated and not connected/not associated with any bridge in the jurisdiction of District 5. 4) Replacing excavated, spalled, delaminated, or deteriorated concrete, and replacing any broken, missing or deteriorated reinforcing steel with new material. 5) Removing and resetting or replacing bearing devices as required. 6) Replacing missing or damaged granite or cement concrete slope paving, either in kind or with cement concrete slope paving where needed and as directed by the Engineer. 7) Any additional repairs in either the superstructure or deck that are related to the substructure work.
AvailableMassachusetts Department of Transportation
Emergency bridge repairs at various locations.
Posted Date
Nov 3, 2025
Due Date
Dec 9, 2025
Release: Nov 3, 2025
Massachusetts Department of Transportation
Close: Dec 9, 2025
Emergency bridge repairs at various locations.
AvailableMassachusetts Department of Conservation and Recreation
Project consists of scheduled and emergency cleaning of drainage structures and pipes. See attached file.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
Massachusetts Department of Conservation and Recreation
Close: Dec 9, 2025
Project consists of scheduled and emergency cleaning of drainage structures and pipes. See attached file.
AvailableMassachusetts Department of Transportation
Scheduled and emergency tree trimming, removal and sight distance clearing. See attached file.
Posted Date
Nov 10, 2025
Due Date
Dec 2, 2025
Release: Nov 10, 2025
Massachusetts Department of Transportation
Close: Dec 2, 2025
Scheduled and emergency tree trimming, removal and sight distance clearing. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →