Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Santa Fe
The City of Santa Fe, NM has posted an emergency procurement for the Calle Mejia Sanitary Sewer Pipe Bursting Rehabilitation Project; all details are provided in the attachments. The posting is currently open and responses are due on December 3, 2025 at 11:30am Mountain Time.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
State of New Mexico
The State of New Mexico is conducting an emergency procurement for the Calle Mejia Sanitary Sewer Pipe Bursting Rehab Project. The solicitation closes on 4 December 2025 at 07:00 AM UTC.
Posted Date
-
Due Date
Dec 4, 2025
State of New Mexico
Close: Dec 4, 2025
The State of New Mexico is conducting an emergency procurement for the Calle Mejia Sanitary Sewer Pipe Bursting Rehab Project. The solicitation closes on 4 December 2025 at 07:00 AM UTC.
AvailableCity of Shawnee
Base Bid 1.Construct 723 LF of 12β HDPE DR-17 sanitary sewer by trenching; 2.Construct 1,946 LF of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct 2,009 L.F. of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 4.Construct six (6) 4β-dia. manholes, remove and replace eleven (11) 4β-dia., 5β-dia., and 6β-dia. manholes. ADD ALTERNATE 1 1.Construct 2,951 L.F. of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct 3,982 L.F. of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct six (6) 4'-diameter manholes, remove and replace nine (9) 5β-dia. manholes. ADD ALTERNATE 2 1.Construct 449 LF of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct 3,172 LF of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct six (6) 4'-diameter manholes, remove and replace five (5) 5β-dia., 6'-dia. manholes.The system must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items.
Posted Date
Nov 6, 2025
Due Date
Dec 8, 2025
Release: Nov 6, 2025
City of Shawnee
Close: Dec 8, 2025
Base Bid 1.Construct 723 LF of 12β HDPE DR-17 sanitary sewer by trenching; 2.Construct 1,946 LF of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct 2,009 L.F. of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 4.Construct six (6) 4β-dia. manholes, remove and replace eleven (11) 4β-dia., 5β-dia., and 6β-dia. manholes. ADD ALTERNATE 1 1.Construct 2,951 L.F. of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct 3,982 L.F. of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct six (6) 4'-diameter manholes, remove and replace nine (9) 5β-dia. manholes. ADD ALTERNATE 2 1.Construct 449 LF of 10β HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct 3,172 LF of 8β HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct six (6) 4'-diameter manholes, remove and replace five (5) 5β-dia., 6'-dia. manholes.The system must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items.
AvailableCity of Smyrna
Provide On-Call Trenchless Rehab of Sanitary Sewer/Stormwater Pipe and Infrastructure Services. The selected Contractor(s) will perform trenchless pipe rehabilitation work on an as-needed basis throughout the city.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
City of Smyrna
Close: Nov 21, 2025
Provide On-Call Trenchless Rehab of Sanitary Sewer/Stormwater Pipe and Infrastructure Services. The selected Contractor(s) will perform trenchless pipe rehabilitation work on an as-needed basis throughout the city.
AvailableCity of Smyrna
Provide on-call trenchless rehab of sanitary sewer/stormwater pipe and infrastructure services.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
City of Smyrna
Close: Nov 21, 2025
Provide on-call trenchless rehab of sanitary sewer/stormwater pipe and infrastructure services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis