Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kentucky Transportation Cabinet
Reconstruction of KY-393
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Heber City
Removing and replacing railroad rail includes rail and rail ties, rail concrete panels, roadway excavation, concrete curb & gutter, road widening, sidewalk signs and striping for railroad crossing.
Posted Date
Oct 20, 2025
Due Date
Nov 20, 2025
Release: Oct 20, 2025
City of Heber City
Close: Nov 20, 2025
Removing and replacing railroad rail includes rail and rail ties, rail concrete panels, roadway excavation, concrete curb & gutter, road widening, sidewalk signs and striping for railroad crossing.
AvailableCity of Oakland
Work includes to reconstructs the asphalt pavement, sidewalks, curb/gutter, and other major elements adjacent the railroad crossing, civil 3d elements as well as traffic striping/signing improvements.
Posted Date
Oct 17, 2025
Due Date
Nov 20, 2025
Release: Oct 17, 2025
City of Oakland
Close: Nov 20, 2025
Work includes to reconstructs the asphalt pavement, sidewalks, curb/gutter, and other major elements adjacent the railroad crossing, civil 3d elements as well as traffic striping/signing improvements.
AvailableKentucky Transportation Cabinet
Reconstruction of intersection
Posted Date
-
Due Date
Jan 29, 2026
Kentucky Transportation Cabinet
Close: Jan 29, 2026
Reconstruction of intersection
AvailableMetro Water Reclamation Of Greater Chicago
Perform specialty inspections, troubleshooting, repairs, maintenance, replacement, improvements, and commissioning work as required on all railroad grade crossings and grade crossing signal systems on District railroads on both a scheduled, and as-needed basis, over a thirty-six (36) month period.
Posted Date
Oct 29, 2025
Due Date
Nov 18, 2025
Release: Oct 29, 2025
Metro Water Reclamation Of Greater Chicago
Close: Nov 18, 2025
Perform specialty inspections, troubleshooting, repairs, maintenance, replacement, improvements, and commissioning work as required on all railroad grade crossings and grade crossing signal systems on District railroads on both a scheduled, and as-needed basis, over a thirty-six (36) month period.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis