Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 100 LF removal of exist. Guardrail; 243 CY unclassified excavation; 1,653 CY borrow excavation; 35,012 SY cement modified recycled base (10" unif)-curing method b; 983 SY full depth asphalt pavement patching 4" unif.; 1,378 SY full depth asphalt pavement patching 6" unif.; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes removal of exist guardrail 100.000 LF, unclassified excavation 243.000 CY, borrow excavation 1,653.500 CY, additional rock for full depth reclamation 607.500 Ton, maintenance stone 26.289 Ton, cement modified recycled base (10" unif) curing method b 35, 012.270 SY, portland cement for cement modified recycled base course 1,225.430 Ton, liquid asphalt binder pg64-22 509.127 Ton, full depth asph pav patching 4" unif 983.680 SY, full depth asph pav patching 6" unif 1,378.220 SY, full depth asph pav patching 8" unif 267.000 SY, surface plane asphalt pavement 1.0" 315.000 SY. See attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Premium
Access the largest public sector contact database
Work includes removal of exist guardrail 100.000 LF, unclassified excavation 243.000 CY, borrow excavation 1,653.500 CY, additional rock for full depth reclamation 607.500 Ton, maintenance stone 26.289 Ton, cement modified recycled base (10" unif) curing method b 35, 012.270 SY, portland cement for cement modified recycled base course 1,225.430 Ton, liquid asphalt binder pg64-22 509.127 Ton, full depth asph pav patching 4" unif 983.680 SY, full depth asph pav patching 6" unif 1,378.220 SY, full depth asph pav patching 8" unif 267.000 SY, surface plane asphalt pavement 1.0" 315.000 SY. See attached file.
Work includes : 272 CY borrow excavation; 2,850 SY cement modified recycled base (10" unif)-curing method b; 275 SY full depth asph. Pav. Patching 8" unif; 2,200 SY milling existing asphalt pavement (variable); 1,364 SF permanent construction signs (ground mounted); see attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work includes : 272 CY borrow excavation; 2,850 SY cement modified recycled base (10" unif)-curing method b; 275 SY full depth asph. Pav. Patching 8" unif; 2,200 SY milling existing asphalt pavement (variable); 1,364 SF permanent construction signs (ground mounted); see attached file.
AvailableResurfacing of roads and/or streets with hot mix asphalt (HMA) pavement materials.
Posted Date
Nov 24, 2025
Due Date
Dec 17, 2025
Release: Nov 24, 2025
Close: Dec 17, 2025
Resurfacing of roads and/or streets with hot mix asphalt (HMA) pavement materials.
Available2026 community crossing resurfacing program.
Posted Date
Dec 10, 2025
Due Date
Feb 2, 2026
Release: Dec 10, 2025
Close: Feb 2, 2026
2026 community crossing resurfacing program.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis