City of Ocala
Qualified mechanical contractor to supply and install a new 275-ton air-cooled chiller system. The contractor will be required to remove the existing unit, procure and install new unit and associated pump replacement or modification. 1. Equipment requirements: * chiller type: packaged air-cooled chiller * capacity: 275 tons. See attached file for full scope.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kansas Department of Administration
Provide 100 ton chiller replacement. A single contract will be awarded for the "project as a whole," including the following classification(s) of work: electrical; mechanical.
Posted Date
Nov 7, 2025
Due Date
Dec 3, 2025
Release: Nov 7, 2025
Kansas Department of Administration
Close: Dec 3, 2025
Provide 100 ton chiller replacement. A single contract will be awarded for the "project as a whole," including the following classification(s) of work: electrical; mechanical.
AvailableNew Hope Christian School
The replacement of the existing air-cooled chiller and upgrading the controls system. The recommended basis of design is a Trane Ascend ACS215 (approx. 215-ton) air-cooled scroll chiller, replacing the existing 270-ton RTAA unit. The existing machine has a history of low-load trips (low suction pressure); per operating history, one circuit was down (β60% capacity) for the 2025 cooling season with no loss of comfort.
Posted Date
Oct 24, 2025
Due Date
Dec 3, 2025
Release: Oct 24, 2025
New Hope Christian School
Close: Dec 3, 2025
The replacement of the existing air-cooled chiller and upgrading the controls system. The recommended basis of design is a Trane Ascend ACS215 (approx. 215-ton) air-cooled scroll chiller, replacing the existing 270-ton RTAA unit. The existing machine has a history of low-load trips (low suction pressure); per operating history, one circuit was down (β60% capacity) for the 2025 cooling season with no loss of comfort.
AvailableRochester Public Schools Independent School District 535
Project consists of the replacement of an existing air cooled chiller and thermal storage system with a new air cooled chiller and primary pumps. Other work includes electrical and general construction updates to accommodate the mechanical equipment replacement.
Posted Date
Nov 2, 2025
Due Date
Nov 20, 2025
Release: Nov 2, 2025
Rochester Public Schools Independent School District 535
Close: Nov 20, 2025
Project consists of the replacement of an existing air cooled chiller and thermal storage system with a new air cooled chiller and primary pumps. Other work includes electrical and general construction updates to accommodate the mechanical equipment replacement.
AvailableSalinas Valley Memorial Healthcare District
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Salinas Valley Memorial Healthcare District
Close: Dec 9, 2025
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis