Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of surface preparation and painting of numerous corroded surfaces inside and outside of pump station; bypass pumping, wet well spray-on liner, wet well exhaust fan, exhaust fan electrical provisions, ultrasonic transducer and float switch replacement, and wet well combustible gas detection system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableProject consists of furnishing specified equipment and materials for the construction of improvements to the lift station.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Project consists of furnishing specified equipment and materials for the construction of improvements to the lift station.
AvailableThe Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The Project includes the following Work: Lift Station Improvements including a new wet well top mounted lift station, concrete pad over the top of the existing 6’ diameter wet well, site piping, valves, and fittings, connection to existing 4” force main, site electrical work, bypass pumping, a new standby generator with automatic transfer switch, demolition of the existing lift station dry well and appurtenances.
AvailableProcurement of construction services for the City of Adel's Lift Station #18 Improvements, involving the installation of a new wetwell, three submersible pumps, and related infrastructure.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of construction services for the City of Adel's Lift Station #18 Improvements, involving the installation of a new wetwell, three submersible pumps, and related infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis