Missouri Department of Transportation
Work includes 94 LF strip seal expansion joint system; 88 LF open cell foam joint seal; 24 EA. laminated neoprene bearing pad assembly; 1,500 SF finish field coat (system g); 1,500 SF field application of organic zinc primer; 1,500 SF surface preparation for recoating structural steel; 54 EA. cleaning and coating existing bearings; 4,450 LB reinforcing steel (epoxy coated); 4.200 CY class b concrete (substructure); 623 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads).
251212-A03, FAF 65-5(24), JNW0049 - Bridge Deck Replacement
zip
Missouri Department of Transportation
Work includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Missouri Department of Transportation
Work includes 28 EA. slab drain; 577 EA. mechanical bar splice; 45 CY class 1 excavation; 200 LF mgs guardrail; 268 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 4,183 LF pavement marking removal; 1,150 LF 6 in. White class 2 pavement marking paint (25-mil, type L beads); 606 SY permanent erosion control geotextile; 793. 000 lf silt fence; 302 LF type C berm; 243 SY type 5 aggregate for base (4" Thick); 21 CY furnishing type 1 rock ditch liner; 21 CY placing type 1 rock ditch liner.
Missouri Department of Transportation
Work includes 1 LS protective coating - concrete bents and piers (urethane); 202 LF type d barrier; 322 SY slab on steel; 18 SY bridge approach slab (minor road); 2,755 SF removal of existing bridge deck; 6 SF SHF-flat sheet fluorescent; 6 EA. concrete post anchor for 2.5 in. Psst. - 7 GA.; 96 LF 2.5 in. Psst post - 12 ga.; 2 EA. breakaway assembly (perforated square steel tube); 325 LF MGS guardrail; 4 EA. asymmetrical transition section, 6.5' Posts.
Release
Nov 06, 2025
Close
Dec 12, 2025