City of Yankton
Work includes approx 2,062 CY of unclassified excavation; 840 SY of 8" nonreinforced PCC pavement; 1,229 LB of reinforcing steel, drop inlets; 62 LF of 11'x7' precast concrete box culvert; 1,007.6 SF of 4" concrete sidewalk; See outside link.
Centerton Municipal Property Owners Imp. Dist. 4
Highway 102 Utility Relocations (Main Street to Highway 279 S).
City of Algood
Installation of approximately 4,300 LF of 12" ductile iron water main replacing existing main, including graded stone and paving replacement, service line and meter installations as well as all necessary appurtenances to provide a complete water line per the plans and specifications.
Borough of Mount Joy
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
Release
Oct 21, 2025
Close
Nov 13, 2025