City of Lakewood
Project consist of approx 14,896 CY of excavation; 700 TON of Hot Mix Asphalt; 380 SY of 6" Concrete Pavement; 2,800 LBS of Reinforcing Steel (epoxy Coated); 896 LF of 18" Reinforced Concrete Pipe (complete in Place); 1,952 SY of 6" Concrete Sidewalk; 1,168 LF of Curb and Gutter Type 2 (SECTION II-B). See outside link.
City of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
City of Hattiesburg
Work consists of sidewalk, driveways, and curb and gutter.
City of Thomaston
Work to be completed for the Avenue N Stormwater & Road Repairs is described briefly as follows: In general, construction shall consist of installation of approx. 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading and stream channel improvements.
Release
Oct 07, 2025
Close
Oct 31, 2025