Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pittsburgh Water and Sewer Authority is soliciting proposals for Construction Management and Construction Inspection (CM/CI) services for surface restoration during the 2026 construction season. The work includes restoration of streets, sidewalks, and properties impacted by water and sewer system work; the estimated construction value is approximately $24,222,424.04 with three contracts anticipated. The contract term begins upon Notice to Proceed for 456 days and includes two optional one-year renewals.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Pittsburgh Water and Sewer Authority is soliciting proposals for Construction Management and Construction Inspection (CM/CI) services for surface restoration during the 2026 construction season. The work includes restoration of streets, sidewalks, and properties impacted by water and sewer system work; the estimated construction value is approximately $24,222,424.04 with three contracts anticipated. The contract term begins upon Notice to Proceed for 456 days and includes two optional one-year renewals.
Posted Date
Dec 7, 2025
Due Date
Jan 13, 2026
Release: Dec 7, 2025
Close: Jan 13, 2026
Pittsburgh Water and Sewer Authority is soliciting proposals for Construction Management and Construction Inspection (CM/CI) services for surface restoration during the 2026 construction season. The work includes restoration of streets, sidewalks, and properties impacted by water and sewer system work; the estimated construction value is approximately $24,222,424.04 with three contracts anticipated. The contract term begins upon Notice to Proceed for 456 days and includes two optional one-year renewals.
AvailableWork includes restoration of the street, sidewalk and property as required due to damage caused by work including water mains, valves, service connections, and hydrants or public sewer system including storm, sanitary, and combined sewer facilitates; rigid base installation with concrete; flexible base installation; concrete slab replacement and joint; crushed stone sub-base for improved streets and unimproved streets; pavement markings, longitudinal centerlines and channelizing lines; pavement markings, stop bars and crosswalk markings; traffic loop detector replacement; replace manhole casting or raise casting up to 1-foot in depth; utility casting adjustments, including risers (provided by utility company). See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Work includes restoration of the street, sidewalk and property as required due to damage caused by work including water mains, valves, service connections, and hydrants or public sewer system including storm, sanitary, and combined sewer facilitates; rigid base installation with concrete; flexible base installation; concrete slab replacement and joint; crushed stone sub-base for improved streets and unimproved streets; pavement markings, longitudinal centerlines and channelizing lines; pavement markings, stop bars and crosswalk markings; traffic loop detector replacement; replace manhole casting or raise casting up to 1-foot in depth; utility casting adjustments, including risers (provided by utility company). See attached file.
Work includes restoration of the street, sidewalk and property as required due to damage caused by work including water mains, valves, service connections, and hydrants or public sewer system including storm, sanitary, and combined sewer facilitates; rigid base installation with concrete; flexible base installation; concrete slab replacement and joint; crushed stone sub-base for improved streets and unimproved streets; pavement markings, longitudinal centerlines and channelizing lines; pavement markings, stop bars and crosswalk markings; traffic loop detector replacement; replace manhole casting or raise casting up to 1-foot in depth; utility casting adjustments, including risers (provided by utility company). See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Work includes restoration of the street, sidewalk and property as required due to damage caused by work including water mains, valves, service connections, and hydrants or public sewer system including storm, sanitary, and combined sewer facilitates; rigid base installation with concrete; flexible base installation; concrete slab replacement and joint; crushed stone sub-base for improved streets and unimproved streets; pavement markings, longitudinal centerlines and channelizing lines; pavement markings, stop bars and crosswalk markings; traffic loop detector replacement; replace manhole casting or raise casting up to 1-foot in depth; utility casting adjustments, including risers (provided by utility company). See attached file.
Maintenance stormwater facilities restoration. The principal items of work consist of: 3,600 hour labor crew, stormwater; 2,000 hour labor crew, video inspection and cleaning.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Maintenance stormwater facilities restoration. The principal items of work consist of: 3,600 hour labor crew, stormwater; 2,000 hour labor crew, video inspection and cleaning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis