Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Rumson
Project generally consists of cleaning and television inspection of approx. 19,800 LF of 8" of existing gravity sanitary sewers, testing of all joints in each sanitary sewer, grouting of joints in each sewer that do not pass the testing, and all other work
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Bridge City
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
Posted Date
Nov 16, 2025
Due Date
Dec 4, 2025
Release: Nov 16, 2025
City of Bridge City
Close: Dec 4, 2025
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
AvailableBorough of Millerstown
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Borough of Millerstown
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableCity of Templeton
Work includes : construct approx 12,043 LF of 8" cured-in-place pipe lined sanitary sewer, grout and reinstate 166 services and miscellaneous associated work, including cleanup.
Posted Date
Nov 11, 2025
Due Date
Nov 25, 2025
Release: Nov 11, 2025
City of Templeton
Close: Nov 25, 2025
Work includes : construct approx 12,043 LF of 8" cured-in-place pipe lined sanitary sewer, grout and reinstate 166 services and miscellaneous associated work, including cleanup.
AvailableVillage of Hoffman Estates
Work includes approx 8,881.5 LF of 8" cured-in-place pipe liner; 9,000 LF of 8" pre-construction sanitary sewer cctv; 360 EA lateral reinstatements; 750 LF of heavy cleaning. See attached file.
Posted Date
Nov 3, 2025
Due Date
Nov 19, 2025
Release: Nov 3, 2025
Village of Hoffman Estates
Close: Nov 19, 2025
Work includes approx 8,881.5 LF of 8" cured-in-place pipe liner; 9,000 LF of 8" pre-construction sanitary sewer cctv; 360 EA lateral reinstatements; 750 LF of heavy cleaning. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis