Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Toledo
The City of Toledo is soliciting bids for '2026 Residential Reconstruction Phase 3', a construction project to reconstruct various roadways within the City of Toledo. Bids must be submitted electronically via the City of Toledo PlanetBids portal and include required City forms, bid guaranty, insurance, and other specified documents; prevailing wages and MBE participation goals apply. The solicitation includes requirements for a Project Labor Agreement (PLA) when applicable and lists a bid opening deadline of December 23, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Toledo
This project will reconstruct various roadways in the city.
Posted Date
Dec 5, 2025
Due Date
Dec 23, 2025
Release: Dec 5, 2025
City of Toledo
Close: Dec 23, 2025
This project will reconstruct various roadways in the city.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Toledo
Roadway Reconstruction Phase 4: 676 LF Fence Removed And Replaced; 601 LF Pipe Removed, 12" and Under; 5,762 CY Excavation; 111 CY Embankment; 4,995 CY Subgrade Excavation; 14,983 SY Subgrade Geotextile Fabric; 14,983 SY Geogrid; 4,995 CY Granular Material, Type C, Modified; 366 LF Full Depth Pavement Sawing; 1,135 CY Asphalt Concrete Base; 2,451 CY Aggregate Base; 1,227 gal Tack Coat; 542 CY Asphalt Concrete, Surface Course, Type 1 (449), PG64-22; 634 CY Asphalt Concrete, Intermediate Course, Type 2 (449), PG64-22; 1,338 SY 6" Non-Reinforced Concrete Pavement, Class MS; 221 SY 8" Non-Reinforced Concrete Pavement, Class MS; 9,741 LF 6" Shallow Pipe Underdrain, Per 707.31 w. Sock; 36,507 SF of 4" 4" Concrete Walk; 400 SF Pedestrian Curb Ramp; 121 LF Curb Wall, 6"-12"; 731 LF Concrete Curb, Type A; 9,056 LF Concrete Curb, Type B Curb and Gutter; 8 LF of 10" Conduit, Type B, Sanitary; 1,341 LF of 12" Conduit, Type B; 299 Lf of 12" Conduit, Type C, Sanitary; 908 LF 15" Conduit, Type B; 5 ea Manhole, No. 3; 8 ea Manhole, Adjusted to Grade; 7 ea Manhole, Reconstructed to Grade; 12 ea Provide Heavy Duty Manhole Casting; 2 ea water Manhole, Adjusted to Grade; 1 ea Water Manhole, Reconstructed to Grade; 1 ea Provide Heavy Duty Water Manhole Casting; 2 ea Sanitary Manhole, 4' Diameter; 4,556 LF 8" Ductile Iron Pipe; 73 ea 1" Water Service Line Replacement; 5 ea 1.5" Water Service Line Replacement; 5 ea 2" Water Service Line Replacement; 6 ea 1" Bore for Service Line Replacement; 5 ea 1.5” Bore for Service Line Replacement; 5 ea 2" Bore for Service Line Replacement. See outside link.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
City of Toledo
Close: Dec 16, 2025
Roadway Reconstruction Phase 4: 676 LF Fence Removed And Replaced; 601 LF Pipe Removed, 12" and Under; 5,762 CY Excavation; 111 CY Embankment; 4,995 CY Subgrade Excavation; 14,983 SY Subgrade Geotextile Fabric; 14,983 SY Geogrid; 4,995 CY Granular Material, Type C, Modified; 366 LF Full Depth Pavement Sawing; 1,135 CY Asphalt Concrete Base; 2,451 CY Aggregate Base; 1,227 gal Tack Coat; 542 CY Asphalt Concrete, Surface Course, Type 1 (449), PG64-22; 634 CY Asphalt Concrete, Intermediate Course, Type 2 (449), PG64-22; 1,338 SY 6" Non-Reinforced Concrete Pavement, Class MS; 221 SY 8" Non-Reinforced Concrete Pavement, Class MS; 9,741 LF 6" Shallow Pipe Underdrain, Per 707.31 w. Sock; 36,507 SF of 4" 4" Concrete Walk; 400 SF Pedestrian Curb Ramp; 121 LF Curb Wall, 6"-12"; 731 LF Concrete Curb, Type A; 9,056 LF Concrete Curb, Type B Curb and Gutter; 8 LF of 10" Conduit, Type B, Sanitary; 1,341 LF of 12" Conduit, Type B; 299 Lf of 12" Conduit, Type C, Sanitary; 908 LF 15" Conduit, Type B; 5 ea Manhole, No. 3; 8 ea Manhole, Adjusted to Grade; 7 ea Manhole, Reconstructed to Grade; 12 ea Provide Heavy Duty Manhole Casting; 2 ea water Manhole, Adjusted to Grade; 1 ea Water Manhole, Reconstructed to Grade; 1 ea Provide Heavy Duty Water Manhole Casting; 2 ea Sanitary Manhole, 4' Diameter; 4,556 LF 8" Ductile Iron Pipe; 73 ea 1" Water Service Line Replacement; 5 ea 1.5" Water Service Line Replacement; 5 ea 2" Water Service Line Replacement; 6 ea 1" Bore for Service Line Replacement; 5 ea 1.5” Bore for Service Line Replacement; 5 ea 2" Bore for Service Line Replacement. See outside link.
AvailableGreat Lakes and Ohio River Division
Provide paducah levees reconstruction phase 3.
Posted Date
Sep 30, 2025
Due Date
Dec 17, 2025
Release: Sep 30, 2025
Great Lakes and Ohio River Division
Close: Dec 17, 2025
Provide paducah levees reconstruction phase 3.
AvailableU.S. Army Engineer District Louisville
The US Army Corps of Engineers, Louisville District (USACE) issued Solicitation W912QR52370251 for the Paducah Levees Reconstruction Phase 3 project to perform levee reconstruction work at 2301 Greenway Trail, Paducah, KY. The procurement is a Total Small Business set-aside under NAICS 237990 and PSC Z2JZ and is structured as work under IDIQ contracts (associated with IDIQ numbers W91237-23-D-0003 through W91237-23-D-0009). Official solicitation details and attachments are hosted on the DoD PIEE/EB portal (login required); SAM.gov shows offers due Dec 17, 2025 and the opportunity is currently active.
Posted Date
Sep 29, 2025
Due Date
Dec 17, 2025
Release: Sep 29, 2025
U.S. Army Engineer District Louisville
Close: Dec 17, 2025
The US Army Corps of Engineers, Louisville District (USACE) issued Solicitation W912QR52370251 for the Paducah Levees Reconstruction Phase 3 project to perform levee reconstruction work at 2301 Greenway Trail, Paducah, KY. The procurement is a Total Small Business set-aside under NAICS 237990 and PSC Z2JZ and is structured as work under IDIQ contracts (associated with IDIQ numbers W91237-23-D-0003 through W91237-23-D-0009). Official solicitation details and attachments are hosted on the DoD PIEE/EB portal (login required); SAM.gov shows offers due Dec 17, 2025 and the opportunity is currently active.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →