Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City and County of Broomfield
Design, fabrication and installation of new outdoor playground equipment at several playgrounds.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cajon Valley Union School District
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Cajon Valley Union School District
Close: Dec 9, 2025
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
AvailableElm Creek School
Roof replacement improvement project.
Posted Date
Nov 6, 2025
Due Date
Dec 3, 2025
Release: Nov 6, 2025
Elm Creek School
Close: Dec 3, 2025
Roof replacement improvement project.
AvailableCity of Oxnard
Dispose of existing playground equipment and replace with a new playground system and installation of new engineered wood fiber safety surfacing.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Oxnard
Close: Nov 25, 2025
Dispose of existing playground equipment and replace with a new playground system and installation of new engineered wood fiber safety surfacing.
AvailableBenton Area School District
Work include demolition, site preparation, drainage improvements, and furnishing and installation of new playground equipment, surfacing, fencing, accessible routes, and related site amenities.
Posted Date
Oct 17, 2025
Due Date
Nov 24, 2025
Release: Oct 17, 2025
Benton Area School District
Close: Nov 24, 2025
Work include demolition, site preparation, drainage improvements, and furnishing and installation of new playground equipment, surfacing, fencing, accessible routes, and related site amenities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis