Town of Manchester
The Town of Manchester is seeking bids for the 2026 Paving Program - Contract 1 to resurface approximately 195,000 square yards of bituminous concrete roads and perform related appurtenant work including traffic control, curb installation, driveway and lawn restoration, and utility adjustments. The project includes full depth pavement replacement, mill and overlay using multiple HMA mixes and is expected to be completed within approximately 150 working days.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Montgomery County
This project involves asphalt paving at five (5) Park, Trail and Historic Sites locations throughout County, consisting of parking lots, access roadways and pathways. The scope includes, but is not limited to, subbase preparation, binder course, wearing course, asphalt seal coat, pavement markings, topsoil backup and permanent restoration.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Montgomery County
Close: Dec 18, 2025
This project involves asphalt paving at five (5) Park, Trail and Historic Sites locations throughout County, consisting of parking lots, access roadways and pathways. The scope includes, but is not limited to, subbase preparation, binder course, wearing course, asphalt seal coat, pavement markings, topsoil backup and permanent restoration.
AvailableCity of Columbus
The work consist of approx 14,570 SY remove paving including sawing; 5,400 LF 4" perforated underdrain piping system; 12,229 SY 9" PC concrete doweled paving; 312 SF ADA handicap ramp detectable warning panel; 57 LF 18" RCP class III storm sewer; 18 EA adjust manhole to grade; 4,860 LF 4" final paint striping yellow solid and dashed.
Posted Date
Nov 7, 2025
Due Date
Nov 25, 2025
Release: Nov 7, 2025
City of Columbus
Close: Nov 25, 2025
The work consist of approx 14,570 SY remove paving including sawing; 5,400 LF 4" perforated underdrain piping system; 12,229 SY 9" PC concrete doweled paving; 312 SF ADA handicap ramp detectable warning panel; 57 LF 18" RCP class III storm sewer; 18 EA adjust manhole to grade; 4,860 LF 4" final paint striping yellow solid and dashed.
AvailableCommunity Concepts Inc
Work includes 1" paving overlay of all existing paved areas, including parking and walkways; repairs and shimming work.
Posted Date
Oct 8, 2025
Due Date
Dec 31, 2025
Release: Oct 8, 2025
Community Concepts Inc
Close: Dec 31, 2025
Work includes 1" paving overlay of all existing paved areas, including parking and walkways; repairs and shimming work.
AvailableClifton-Fine Central School District
2025-2026 capital outlay project (septic and plumbing) - contract no. 1 - plumbing.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Clifton-Fine Central School District
Close: Dec 9, 2025
2025-2026 capital outlay project (septic and plumbing) - contract no. 1 - plumbing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis