Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Connecticut Department of Transportation
The Connecticut Department of Transportation seeks bids for the 2026 Pavement Preservation Program UTBO on Route 72 & I-84 in the Town of Plain, covering pavement preservation and construction work. Bid documents (contract special provisions, plans, and an Invitation to Bid) are hosted on the buyer's WebProcure procurement portal and require login to access.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Connecticut Office of the Attorney General
Work includes earth excavation, removal of concrete sidewalk, cut bituminous concrete pavement, bituminous concrete patching, joint and crack sealing of bituminous concrete pavement, pavement marking, fine milling of bituminous concrete, clean existing catch basin, repair guiderail, maintenance and protection of traffic, trenching and backfilling, adjust gate boxes.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
Connecticut Office of the Attorney General
Close: Dec 3, 2025
Work includes earth excavation, removal of concrete sidewalk, cut bituminous concrete pavement, bituminous concrete patching, joint and crack sealing of bituminous concrete pavement, pavement marking, fine milling of bituminous concrete, clean existing catch basin, repair guiderail, maintenance and protection of traffic, trenching and backfilling, adjust gate boxes.
AvailableConnecticut Office of the Attorney General
Work includes 3 CY of earth excavation, 1225 LF of cut bituminous concrete pavement, 1288 LF of 80 mil pavement marking.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Connecticut Office of the Attorney General
Close: Dec 17, 2025
Work includes 3 CY of earth excavation, 1225 LF of cut bituminous concrete pavement, 1288 LF of 80 mil pavement marking.
AvailableCity of Chico
The City of Chico, CA seeks qualified contractors to perform pavement preservation along Forest Avenue from E. 8th Street to Skyway and on specified minor streets, including traffic control, clearing and grubbing, Type II slurry seal, and thermoplastic restriping. Work must comply with 2023 Caltrans Standard Specifications and special provisions; the engineer’s estimate is approximately $964,100 with 40 working days and prevailing wage requirements.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
City of Chico
Close: Dec 4, 2025
The City of Chico, CA seeks qualified contractors to perform pavement preservation along Forest Avenue from E. 8th Street to Skyway and on specified minor streets, including traffic control, clearing and grubbing, Type II slurry seal, and thermoplastic restriping. Work must comply with 2023 Caltrans Standard Specifications and special provisions; the engineer’s estimate is approximately $964,100 with 40 working days and prevailing wage requirements.
AvailableConnecticut Office of the Attorney General
Work includes 35 CY earth excavation; 600 LF cut bituminous concrete pavement; 25 CY processed aggregate base; 133 TN processed aggregate; 860 SY bituminous concrete surface patching; 550 SY bituminous concrete patching partial depth; 14,770 TN thin friction wearing course; 335,110 SY joint and crack sealing of bituminous concrete pavement; 21,427 GAL non-tracking asphalt tack coat; 164, 465 LF 80 mil pavement marking groove 5" wide; 168,392 LF 80 mil pavement marking groove 7" wide. See attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Connecticut Office of the Attorney General
Close: Dec 10, 2025
Work includes 35 CY earth excavation; 600 LF cut bituminous concrete pavement; 25 CY processed aggregate base; 133 TN processed aggregate; 860 SY bituminous concrete surface patching; 550 SY bituminous concrete patching partial depth; 14,770 TN thin friction wearing course; 335,110 SY joint and crack sealing of bituminous concrete pavement; 21,427 GAL non-tracking asphalt tack coat; 164, 465 LF 80 mil pavement marking groove 5" wide; 168,392 LF 80 mil pavement marking groove 7" wide. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis