Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Byron Community Unit School District 226
High School Main Office renovation project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Ottawa Township High School District 140
Ottawa Township High School District 140 is soliciting bids for its 2026 building renovation project at Ottawa Township High School in Illinois. Bidding documents are posted on the architect’s plan room, and bids are due on December 3, 2025.
Posted Date
-
Due Date
Dec 3, 2025
Ottawa Township High School District 140
Close: Dec 3, 2025
Ottawa Township High School District 140 is soliciting bids for its 2026 building renovation project at Ottawa Township High School in Illinois. Bidding documents are posted on the architect’s plan room, and bids are due on December 3, 2025.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Ottawa
High school building renovation.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Township of Ottawa
Close: Dec 3, 2025
High school building renovation.
AvailableLuminest, Inc
Work includes south main commons renovation.
Posted Date
Nov 9, 2025
Due Date
Dec 19, 2025
Release: Nov 9, 2025
Luminest, Inc
Close: Dec 19, 2025
Work includes south main commons renovation.
AvailableHopkinton School District
Sealed proposal for Construction Management Services (CM) for the Middle High School. The project consists of an interior renovation of an existing school main office facility. The core renovation area is roughly 2239 SQ. FT. The project scope will include - Select demolition of existing walls, doors, ceilings, windows, flooring, and built-in furniture in the current main office, teachers’ room, and classroom 202. Renovate the spaces by adding walls, doors (interior and exterior), ceilings, windows, flooring, and built-in reception desk. The Guidance office room 201B wall will be demo’d and expanded. Trades work will match existing systems that include electrical, plumbing HVAC, Fire system, Sprinkler system, moving of security viewing monitors, intercom system, data wires, and cabling. The vestibule will receive a hardened safety wall and glass protection.
Posted Date
Oct 28, 2025
Due Date
Dec 15, 2025
Release: Oct 28, 2025
Hopkinton School District
Close: Dec 15, 2025
Sealed proposal for Construction Management Services (CM) for the Middle High School. The project consists of an interior renovation of an existing school main office facility. The core renovation area is roughly 2239 SQ. FT. The project scope will include - Select demolition of existing walls, doors, ceilings, windows, flooring, and built-in furniture in the current main office, teachers’ room, and classroom 202. Renovate the spaces by adding walls, doors (interior and exterior), ceilings, windows, flooring, and built-in reception desk. The Guidance office room 201B wall will be demo’d and expanded. Trades work will match existing systems that include electrical, plumbing HVAC, Fire system, Sprinkler system, moving of security viewing monitors, intercom system, data wires, and cabling. The vestibule will receive a hardened safety wall and glass protection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →