Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction consists of one (1) service lateral point repair, 280 LF of 4" service lateral CIPP in Twin Lakes Basin 7, one (1) sanitary sewer point repair, and other miscellaneous items of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction consists of one (1) service lateral point repair, 280 LF of 4" service lateral cipp, and one (1) sanitary sewer point repair; one (1) service lateral point repair; three (3) sanitary sewer point repairs and 846 LF of 8" sanitary sewer cipp; three (3) sanitary sewer point repairs, 203 lf of 8" sanitary sewer cipp, and 313 LF of 18" sanitary sewer cipp; and other miscellaneous items of work.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction consists of one (1) service lateral point repair, 280 LF of 4" service lateral cipp, and one (1) sanitary sewer point repair; one (1) service lateral point repair; three (3) sanitary sewer point repairs and 846 LF of 8" sanitary sewer cipp; three (3) sanitary sewer point repairs, 203 lf of 8" sanitary sewer cipp, and 313 LF of 18" sanitary sewer cipp; and other miscellaneous items of work.
Premium
Access the largest public sector contact database
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableWork, including 2,572 LF of 4”, 6”, 8”, and 10” SDR 35 PVC sanitary sewer rehabilitation, with 4’ Ø manhole cleanout and service transfers. 149 LF 12" bore, 149 LF 12" encasement, 95 LF 0-5' trenching, 237 LF asphalt pavement repair, 2 EA abandon existing sanitary sewer line, 1, 021 LF Grout, cap, and abandon existing sanitary sewer line. 8 LF fence repair, 2 EA tree removal, 1,991 LS reseeding, 40 LF 12" HDPE culvert.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Work, including 2,572 LF of 4”, 6”, 8”, and 10” SDR 35 PVC sanitary sewer rehabilitation, with 4’ Ø manhole cleanout and service transfers. 149 LF 12" bore, 149 LF 12" encasement, 95 LF 0-5' trenching, 237 LF asphalt pavement repair, 2 EA abandon existing sanitary sewer line, 1, 021 LF Grout, cap, and abandon existing sanitary sewer line. 8 LF fence repair, 2 EA tree removal, 1,991 LS reseeding, 40 LF 12" HDPE culvert.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis