Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Rogers County Rural Water District 3
WTP pump replacement project consisting of pump replacement and piping improvements with associated appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kent County
Replace and abandon existing Well #2 by constructing a new well adjacent to it, to be named Well #4. Work also includes a new well pump, minor site work, minor pipe work, a replacement motor starter, and electrical work associated with the new well pump.
Posted Date
Oct 21, 2025
Due Date
Nov 24, 2025
Release: Oct 21, 2025
Kent County
Close: Nov 24, 2025
Replace and abandon existing Well #2 by constructing a new well adjacent to it, to be named Well #4. Work also includes a new well pump, minor site work, minor pipe work, a replacement motor starter, and electrical work associated with the new well pump.
AvailableMassachusetts Water Resources Authority
Project consists of roof replacement. See attached file.
Posted Date
Sep 29, 2025
Due Date
Dec 12, 2025
Release: Sep 29, 2025
Massachusetts Water Resources Authority
Close: Dec 12, 2025
Project consists of roof replacement. See attached file.
AvailableCity of Woodstock
Replacing and installing four (4) fixed generators at critical facilities in the community and upgrading the generator at the City Annex. This includes but is not limited to upgrading the 30 kW generator at the City Annex to a 175-kW fixed to include an automatic transfer switch and concrete pad, replacing two (2) pump stations at Brookshire (50 kW, 100 kW), and two (2) pump stations at Bell Park (75kW).
Posted Date
Sep 18, 2025
Due Date
Dec 3, 2025
Release: Sep 18, 2025
City of Woodstock
Close: Dec 3, 2025
Replacing and installing four (4) fixed generators at critical facilities in the community and upgrading the generator at the City Annex. This includes but is not limited to upgrading the 30 kW generator at the City Annex to a 175-kW fixed to include an automatic transfer switch and concrete pad, replacing two (2) pump stations at Brookshire (50 kW, 100 kW), and two (2) pump stations at Bell Park (75kW).
AvailableCity of Cameron
The City of Cameron is soliciting bids for the Little River Pump Station (rebid), including construction of a pump station with a 20-foot inside diameter circular wet well, intake piping with screens, a low‑head impoundment structure, and a 16‑inch raw water line. Work also includes a diesel‑fueled generator, an electrical building, and associated electrical and control improvements.
Posted Date
-
Due Date
Dec 4, 2025
City of Cameron
Close: Dec 4, 2025
The City of Cameron is soliciting bids for the Little River Pump Station (rebid), including construction of a pump station with a 20-foot inside diameter circular wet well, intake piping with screens, a low‑head impoundment structure, and a 16‑inch raw water line. Work also includes a diesel‑fueled generator, an electrical building, and associated electrical and control improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis