Retrieving RFP details
Release
Close
Pickens County
Road reclamation and rehabilitation.
Jackson Township Fire District 4
Paving project.
Iron County
Work includes roadway preparation, asphalt paving, precast concrete culvert installation, traffic control and other incidental items and work.
Bay County
Work includes 29500 LF sediment barrier, 110 EA inlet protection system, 2900 cy regular excavation, 32800 SY 12" type b stabilization (lbr-40), 630 LF pipe culvert, optional material, round, 18" sd (rcp), 430 LF pipe culvert, optional material, round, 18" sd (cmp), 4 EA single post sign, relocate, 3 ea furnish & install stop sign, 180 LF white - 24" wide solid stripe (stop bar). See attached file.
Release
Oct 07, 2025
Close
Oct 30, 2025