Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Blue Ash
Work include paint and flooring.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Blue Ash
Work includes replace the existing carpet and flooring in select areas of the cooper creek event center.
Posted Date
Nov 14, 2025
Due Date
Dec 3, 2025
Release: Nov 14, 2025
City of Blue Ash
Close: Dec 3, 2025
Work includes replace the existing carpet and flooring in select areas of the cooper creek event center.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Natrona County School District
Work consist of Paint Project.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Natrona County School District
Close: Dec 3, 2025
Work consist of Paint Project.
AvailablePine Bluff Wastewater Utility
Bottom Ash/Fly Ash.
Posted Date
Nov 18, 2025
Due Date
Dec 8, 2025
Release: Nov 18, 2025
Pine Bluff Wastewater Utility
Close: Dec 8, 2025
Bottom Ash/Fly Ash.
AvailableSuny Upstate Medical University
Renovation of approx. 8,000 SF on the third floor of the Upstate Downtown Campus to create a new class 2 interventional radiology procedure room, pre- and post-procedure patient care area, waiting room, a diagnostic ultrasound with patient toilet, patient holding bays, a resident lounge, offices, and other staff support spaces under Article 28 with the NYS Department of Health. This work includes but is not limited to, selective demolition, hazardous material abatement, general construction, mechanical, electrical, HVAC controls, and plumbing work, sprinklers, and coordination with new imaging equipment which will be supplied by others. In addition, this project will be replacing approximately 2,000 sf of roof. There will also be associated MEP work in the sub-basement, second floor to serve the third-floor renovations and a new roof top AHU.
Posted Date
Oct 24, 2025
Due Date
Dec 4, 2025
Release: Oct 24, 2025
Suny Upstate Medical University
Close: Dec 4, 2025
Renovation of approx. 8,000 SF on the third floor of the Upstate Downtown Campus to create a new class 2 interventional radiology procedure room, pre- and post-procedure patient care area, waiting room, a diagnostic ultrasound with patient toilet, patient holding bays, a resident lounge, offices, and other staff support spaces under Article 28 with the NYS Department of Health. This work includes but is not limited to, selective demolition, hazardous material abatement, general construction, mechanical, electrical, HVAC controls, and plumbing work, sprinklers, and coordination with new imaging equipment which will be supplied by others. In addition, this project will be replacing approximately 2,000 sf of roof. There will also be associated MEP work in the sub-basement, second floor to serve the third-floor renovations and a new roof top AHU.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →