Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Copper Canyon
Project will consist of miscellaneous pavement repairs and drainage improvements to be administered by work orders as needed. Approx. 15,000 LF Crack Sealing; Flexbase for Base Repair; 125 Ton Type D Asphalt Overlay; 30 LF 48" RCP Culvert; 500 SY Solid Sod (Common Bermuda);
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Quincy
Drainage Improvements.
Posted Date
Oct 31, 2025
Due Date
Dec 10, 2025
Release: Oct 31, 2025
City of Quincy
Close: Dec 10, 2025
Drainage Improvements.
AvailableCounty of Cumberland
Drainage improvements: 3 unit manhole, 5' diameter; 102 LF of 12" HDPE pipe; 325 LF of 15" HDPE pipe; 1,008 LF of 18" HDPE pipe; 1,296 LF of 24" HDPE pipe; 42 LF of 800" HDPE pipe; 715 LF of 48" HDPE pipe; 50 LF of 18" HDPE pipe in 4'x4' stone trench; 1,706 LF of 12" ductile iron pipe; 1,350 LF of 16" ductile iron pipe; 205 LF of 18" ductile iron pipe. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 3, 2025
Release: Nov 14, 2025
County of Cumberland
Close: Dec 3, 2025
Drainage improvements: 3 unit manhole, 5' diameter; 102 LF of 12" HDPE pipe; 325 LF of 15" HDPE pipe; 1,008 LF of 18" HDPE pipe; 1,296 LF of 24" HDPE pipe; 42 LF of 800" HDPE pipe; 715 LF of 48" HDPE pipe; 50 LF of 18" HDPE pipe in 4'x4' stone trench; 1,706 LF of 12" ductile iron pipe; 1,350 LF of 16" ductile iron pipe; 205 LF of 18" ductile iron pipe. See attached file.
AvailableCity of Tigard
The City of Tigard is soliciting bids to construct ADA curb ramp improvements at various locations as part of its 2025 Pavement Management Program. The project includes removal and replacement of curb ramps to meet ADA standards and associated minor sidewalk/roadway work; bids are due December 2, 2025.
Posted Date
-
Due Date
Dec 2, 2025
City of Tigard
Close: Dec 2, 2025
The City of Tigard is soliciting bids to construct ADA curb ramp improvements at various locations as part of its 2025 Pavement Management Program. The project includes removal and replacement of curb ramps to meet ADA standards and associated minor sidewalk/roadway work; bids are due December 2, 2025.
AvailableCity of Tigard
The City of Tigard is soliciting bids to construct ADA curb ramp improvements at various locations as part of its 2025 Pavement Management Program. The project includes removal and replacement of curb ramps to meet ADA standards and associated minor sidewalk/roadway work; bids are due December 2, 2025.
Posted Date
-
Due Date
Dec 2, 2025
City of Tigard
Close: Dec 2, 2025
The City of Tigard is soliciting bids to construct ADA curb ramp improvements at various locations as part of its 2025 Pavement Management Program. The project includes removal and replacement of curb ramps to meet ADA standards and associated minor sidewalk/roadway work; bids are due December 2, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis