Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Pittsburgh Water And Sewer Authority
Work include replace small diameter water lines 4" through 12" in diameter.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Opelika City Housing Authority
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Opelika City Housing Authority
Close: Dec 16, 2025
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
AvailableCity of Arroyo Grande
Work includes installing approximately 221 lf of new 6" diameter potable water main and 296 lf of new 8" diameter potable water main, in the public right-of-way including replacement of services and appurtenances, abandonment of existing water main and replacement of galvanized services in several streets throughout the city. Traffic control; 221 lf 6" c900 pvc waterline; 296 lf 8" c900 pvc waterline; 8" waterline tie-in; 6" waterline tie-in; 2 ls connection on vernon street to existing 6" acp; install air & vacuum relief valve assembly; install fire hydrant assembly (hydrant provided by city) & blue reflector; reconnect fire hydrant assembly in street. See outside link.
Posted Date
Oct 30, 2025
Due Date
Nov 21, 2025
Release: Oct 30, 2025
City of Arroyo Grande
Close: Nov 21, 2025
Work includes installing approximately 221 lf of new 6" diameter potable water main and 296 lf of new 8" diameter potable water main, in the public right-of-way including replacement of services and appurtenances, abandonment of existing water main and replacement of galvanized services in several streets throughout the city. Traffic control; 221 lf 6" c900 pvc waterline; 296 lf 8" c900 pvc waterline; 8" waterline tie-in; 6" waterline tie-in; 2 ls connection on vernon street to existing 6" acp; install air & vacuum relief valve assembly; install fire hydrant assembly (hydrant provided by city) & blue reflector; reconnect fire hydrant assembly in street. See outside link.
AvailableCity of Temple Terrace
Work includes the relocation of water lines from rear yard easements. Installation of approximately 3,500 linear feet of 6-inch c900 pvc water main. Approximately 5,900 linear feet of old water mains within the row, side and rear yard easements are expected to be grout filled and abandoned. Relocate water and irrigation service connections from the side or rear lot lines to the new water mains located in the front of the lots in the public rights-of-way.
Posted Date
Sep 8, 2025
Due Date
Dec 5, 2025
Release: Sep 8, 2025
City of Temple Terrace
Close: Dec 5, 2025
Work includes the relocation of water lines from rear yard easements. Installation of approximately 3,500 linear feet of 6-inch c900 pvc water main. Approximately 5,900 linear feet of old water mains within the row, side and rear yard easements are expected to be grout filled and abandoned. Relocate water and irrigation service connections from the side or rear lot lines to the new water mains located in the front of the lots in the public rights-of-way.
AvailableChesterfield County
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
Chesterfield County
Close: Dec 9, 2025
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis