Work includes water meter replacement. Project consists of: The replacement of approx. 586 existing 3/4" water meters with new AMR meters. The replacement of approx. 4 existing 1" water meters with new AMR meters. The replacement of approx. 2 existing 1-1/2" water meters with new AMR meters. The replacement of approx. 2 existing 2" water meters with new AMR meters. Replace approx. 100 meter boxes. Adjust/Level approx. 25 meter boxes. Install approx. 10,000 LF of PEXa service line reconnection. Replace approx. 25 existing tapping saddles with new tapping saddles. Replace approx. 25 existing curb stops with new curb stops. Pavement Repair.
2024 Big Sandy CDBG Water Meter Replacement - *REBID*
zip
Cleary Water Sewer And Fire Protection District
Construction of 2025 water meter replacement replace all existing water meters aling with meter boxes, meter box tops, and curb stops as necessary. Also includes software and setup, software training, and other incidental items necessary to complete work and have a fully functionable ami meter reading system.
City of Sylvester
Contract a: meter installation services: the work shall generally consist of the following: providing all appurtenances and performing all labor to install +/- 2,750 water meters sized 3/4" and 1", +/- 70 water meters(sized 1-1/2" and 2", +/- 15 water meters sized 3" - 8", backflow preventers, meter box replacements, registers, and all other requirements to complete the project. Contract b: automated meter reading equipment: the work shall generally cover costs and technical support associated with furnishing +/- 2,840 water meters and backflow preventers with amr transmitters, a laptop computer for data collection, back-up meter reading equipment, software, set-up, training, and all other appurtenances necessary to complete the project.
Borough of Rocky Hill
Water Meter and Equipment Replacement Project The major construction items include approx. 297 units 5/8" x 3/4 " water meter replacement (Borough Supplied Meters); 297 units install/replace meter radio transceiver units (Borough Supplied Radio Transceiver Units); 297 units install/replace meter touch pads (Borough Supplied Meter Touch Pads), and other incidental work appurtenant thereto.
Release
Sep 04, 2025
Close
Nov 13, 2025