Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cleaning of all concrete surfaces, including walls, sidewalks, rails and stairs along approx. 0.19 mi of roadway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Concrete Project.
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
Concrete Project.
AvailablePremium
Access the largest public sector contact database
Overhaul of old carrollton underpass pumping station.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Overhaul of old carrollton underpass pumping station.
AvailableConsultants who wish to be evaluated and considered to provide Construction Management/Construction Administration (CM/CA) Services associated with the City's upcoming 44th Ave W Underpass Pedestrian and Bicycle Improvement Project (Project). The City's Project will be constructed primarily along the west side 44th Ave W, from the I-5 off-ramp to approx. 700 feet north of the Underpass, within WSDOT limited access. Construction activities include utility relocation, grading, demolition of existing concrete sidewalk, construction of retaining walls, concrete sidewalk, concrete sidewalk with thickened edge, grading, installation of pedestrian and street lighting, traffic signals, and other work.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Consultants who wish to be evaluated and considered to provide Construction Management/Construction Administration (CM/CA) Services associated with the City's upcoming 44th Ave W Underpass Pedestrian and Bicycle Improvement Project (Project). The City's Project will be constructed primarily along the west side 44th Ave W, from the I-5 off-ramp to approx. 700 feet north of the Underpass, within WSDOT limited access. Construction activities include utility relocation, grading, demolition of existing concrete sidewalk, construction of retaining walls, concrete sidewalk, concrete sidewalk with thickened edge, grading, installation of pedestrian and street lighting, traffic signals, and other work.
AvailablePerform construction on the Veteran s Affairs Medical Center. VAMC Muskogee currently has fire water and domestic water system supplied from a single loop. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. The contractor will need to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications that will be provided. Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. The contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. The contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration.
Posted Date
Sep 17, 2025
Due Date
Dec 17, 2025
Release: Sep 17, 2025
Close: Dec 17, 2025
Perform construction on the Veteran s Affairs Medical Center. VAMC Muskogee currently has fire water and domestic water system supplied from a single loop. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. The contractor will need to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications that will be provided. Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. The contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. The contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis