Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of San Antonio
1-Time Purchase of Gravity Belt Thickner Feed Pump.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
San Antonio Water System (SAWS)
1-Time Purchase of Gravity Belt Thickener Discharge Pump.
Posted Date
Nov 10, 2025
Due Date
Nov 25, 2025
Release: Nov 10, 2025
San Antonio Water System (SAWS)
Close: Nov 25, 2025
1-Time Purchase of Gravity Belt Thickener Discharge Pump.
AvailableCity of Orlando
Work includes demolition of existing facilities including curbing, slabs, existing polymer feed systems, and modifications to existing sludge feed piping; construction of a new 2-meter gravity belt thickener (GBT), complete with ancillary equipment, sludge conditioning system, built-in retention tank, gravity drainage section, belt alignment and tensioning system, and belt washing system, an in-line mixer for polymer, discharge chute, discharge conveyor pump, and new wash water pump; construction of polymer feed system including three (3) new polymer feed units to replace the existing units and feed the existing GBT and new GBT; piping and valves; structural modifications including concrete curbing and slabs; modification of electrical systems for new equipment including construction of a motor control center and new control panel for GBT and polymer feed systems.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
City of Orlando
Close: Dec 18, 2025
Work includes demolition of existing facilities including curbing, slabs, existing polymer feed systems, and modifications to existing sludge feed piping; construction of a new 2-meter gravity belt thickener (GBT), complete with ancillary equipment, sludge conditioning system, built-in retention tank, gravity drainage section, belt alignment and tensioning system, and belt washing system, an in-line mixer for polymer, discharge chute, discharge conveyor pump, and new wash water pump; construction of polymer feed system including three (3) new polymer feed units to replace the existing units and feed the existing GBT and new GBT; piping and valves; structural modifications including concrete curbing and slabs; modification of electrical systems for new equipment including construction of a motor control center and new control panel for GBT and polymer feed systems.
AvailableSan Antonio Water System (SAWS)
1-Time Purchase of Flender Gearbox.
Posted Date
Nov 19, 2025
Due Date
Dec 5, 2025
Release: Nov 19, 2025
San Antonio Water System (SAWS)
Close: Dec 5, 2025
1-Time Purchase of Flender Gearbox.
AvailableSan Antonio Water System (SAWS)
1-Time Purchase of Aeration Basin Slide Gates.
Posted Date
Nov 19, 2025
Due Date
Dec 5, 2025
Release: Nov 19, 2025
San Antonio Water System (SAWS)
Close: Dec 5, 2025
1-Time Purchase of Aeration Basin Slide Gates.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis