Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
North Texas Tollway Authority
Provide routine bridge maintenance repairs including rocker bearing resetting and replacement, cleaning and painting of steel beam ends, diaphragms and rocker bearings, miscellaneous rip rap repairs, and concrete spall repairs at beam ends.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
North Texas Tollway Authority
Provide routine bridge maintenance repairs including rocker bearing resetting and replacement, cleaning and painting of steel beam ends, diaphragms and rocker bearings, miscellaneous rip rap repairs, and concrete spall repairs at beam ends.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
North Texas Tollway Authority
Close: Dec 18, 2025
Provide routine bridge maintenance repairs including rocker bearing resetting and replacement, cleaning and painting of steel beam ends, diaphragms and rocker bearings, miscellaneous rip rap repairs, and concrete spall repairs at beam ends.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Portland
To perform beam connection repairs, and steel cleaning and painting, including all preparation and application and clean up per the specifications and manufacturers recommendations.
Posted Date
Nov 8, 2025
Due Date
Dec 18, 2025
Release: Nov 8, 2025
City of Portland
Close: Dec 18, 2025
To perform beam connection repairs, and steel cleaning and painting, including all preparation and application and clean up per the specifications and manufacturers recommendations.
AvailableBurlington County Bridge Commission
Concrete and steel repairs for the tacony-palmyra bridge.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Burlington County Bridge Commission
Close: Jan 6, 2026
Concrete and steel repairs for the tacony-palmyra bridge.
AvailableIndiana Department of Transportation
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
Posted Date
Oct 15, 2025
Due Date
Dec 10, 2025
Release: Oct 15, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →