Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
California Department of Transportation
Portable changeable message sign (ls); 18 ea move-in/move-out (temporary erosion control); street sweeping; 286,000 CY roadway excavation; 1,414 CY (f) - structure excavation (bridge).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Mission and Installation Contracting Command (MICC)
Provide construct stream bridge to replace NRP-03.
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Mission and Installation Contracting Command (MICC)
Close: Jan 14, 2026
Provide construct stream bridge to replace NRP-03.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kentucky Transportation Cabinet
Construct turn lanes
Posted Date
-
Due Date
Jan 29, 2026
Kentucky Transportation Cabinet
Close: Jan 29, 2026
Construct turn lanes
AvailableSusquehanna Area Regional Airport Authority
The work generally consists of the replacement of existing passenger boarding bridges at the Airport. The construction scope of work includes, but is not limited to the following work items: Installation of Temporary Construction Items; Removal of Existing Passenger Boarding Bridges (PBB); Installation of the proposed PBB and ancillary equipment; Remove existing PC Air/400Hz Equipment from existing PBB and install on New PBB; Final adjustments (including commissioning and acceptance).
Posted Date
Jun 27, 2025
Due Date
Dec 22, 2025
Release: Jun 27, 2025
Susquehanna Area Regional Airport Authority
Close: Dec 22, 2025
The work generally consists of the replacement of existing passenger boarding bridges at the Airport. The construction scope of work includes, but is not limited to the following work items: Installation of Temporary Construction Items; Removal of Existing Passenger Boarding Bridges (PBB); Installation of the proposed PBB and ancillary equipment; Remove existing PC Air/400Hz Equipment from existing PBB and install on New PBB; Final adjustments (including commissioning and acceptance).
AvailableCalifornia Department of Transportation
Construct electrical service building. Plant establishment work; 2.3 CY wood mulch.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
California Department of Transportation
Close: Dec 11, 2025
Construct electrical service building. Plant establishment work; 2.3 CY wood mulch.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →