City of Rupert
The work includes but is not limited to, civil, structural, mechanical, electrical, hvac, and instrumentation 11 work. The expansion will include fine screen equipment, new aeration system in the existing aeration lagoons, blowers, secondary ras pumps, mbr equipment and system, upgrading the existing uv system, a building addition to the existing headworks building, a new fine screen building, retrofitting 14 the existing clarifiers to a mbr building and basins, electrical service equipment, an electrical 15 generator, and hvac equipment. The wwtp expansion will be located at the existing wwtp site. 16 the existing wwtp must remain in service during the entire duration of construction.
bulk
zip
Release
Sep 10, 2024
Close
Oct 28, 2024