Orange Water and Sewer Authority
Expand an existing conference room on the second level of the Water Treatment Plant to include the adjacent mail room and vestibule space; demolition of existing ceilings of all affected spaces, to be replaced with one uniform height; reconfiguration of existing mechanical and electrical systems; re-use existing shelving in conference room in new design; new carpet and paint to match materials used in the Administrative Building; reconfigure conference table, monitor, etc. within the newly defined room; coordination with IT department as needed;
272-68-Advertisement (1)
Release
Sep 23, 2024
Close
Oct 22, 2024