Retrieving RFP details
Release
Close
City of Woodbury
Approx. quantities: 1,570 ton, bituminous mixtures; 480 SF concrete sidewalk or pedestrian ramp; 4,755 CY excavation - common (EV)(P); 1,500 SF prefabricated modular block wall; 3,225 ton aggregate base, class 5; 18,140 SY salvage and respread topsoil; 10 AC turf restoration; 3,240 LF silt fence; 9,775 SY rolled erosion protection.
City of Woodbury
Raw Water Transmission Pipeline.
San Antonio River Authority
This project involves the construction of a 1.6-mile, 12' wide concrete trail that will connect to the existing Culebra Creek Trails within the Howard W. Peak Greenway Trails System. The project will include one street connection at Culebra Road and one neighborhood connection to the Nueces Canyon neighborhood, enhancing trail accessibility and connectivity within the area. See attached file.
Louisiana Division of Administration
Work includes make improvements to an existing ATV/UTV trail. Also includes atv/UTV trail is approx. 1 mile in length, 38,213-acres; reshaping road with 4:1 slope; provide culvert installation at major drains, reshaping ditches and resurfacing trail with #57 limestone. Approx. three 24"x 40' 14-gauge polymer coated corrugated metal pipe culverts.
Release
Oct 27, 2025
Close
Nov 20, 2025