City Of Woodbury
Work includes, 2,250LF 18” PVC Sanitary Sewer, 39,000LF 20” - 42” DIP Water Main, 1LS Cathodic Protection System, 1EA Poured-in-place Concrete Valve Vault, 5,500LF 12” - 48” RCP Storm Sewer, 48,000SY Remove Bituminous Street Pavement, 2,100SY Remove Concrete Street Pavement, 6,300SY Mill Bituminous Surface (2”), 51,000CY Excavation – Common and Subgrade, 31,500TN Aggregate Base, Class 5, 62,800TN Aggregate Backfill – Modified, 31,000LF Concrete Curb and Gutter, 18,300TN Bituminous Mixture for Streets, 3,800TN Bituminous Mixture for Trails, 80,000SY Restoration (Seed/Hydraulic Matrix, Topsoil/Compost Mix), 234EA Deciduous Tree, 2” Cal B&B, 170 SF Sign Panels, Type C, 2EA Revise Signal System, 2EA Revise Flasher System, 56,000 LF Pavement Markings, 2,100SF Modular Block Retaining Wall.
Release
Dec 02, 2024
Close
Jan 09, 2025