Wood County
Work will consist of removing all the existing heating system's hot water piping, hot water unit heaters, fin-tube, etc. And replacing with new piping, fintube & equipment. Also included will be removing the existing split system serving the office space and replace with two separate mini splits. Minimal work is intended inside the mechanical/boiler room unless specifically identified on the documents, with the exception of the existing inline pump p-3.
bulk
zip
Release
Aug 21, 2024
Close
Oct 17, 2024