Work includes the construction of a covered biochar composting facility for horse manure storage, as well as installation of electrical outlets throughout the farm for holiday light displays. The compost facility generally consists of a three sided 100' x 20' pre-fabricated metal building covering six cast-in-place concrete bays on spread footings. The floor of the bays/building is a 6” fiber reinforced concrete pad. This work also includes the relocation of 6” and 3” water lines around the building, storm sewer/drainage, a small, vegetated wetland for treating runoff, a concrete drive apron in front of the building, and miscellaneous site improvements around the building. The electrical work consists of providing power and lighting to the biochar composting facility.
Release
May 12, 2025
Close
Jun 05, 2025