Retrieving RFP details
Release
Close
Village of Floral Park
Work includes clearing and grubbing (belmont racetrack property) 1 ls; unclassified excavation 70 cy; recharge basin excavation 35,000 cy; recharge basin excavation 35,000 cy; cement concrete breaking (pavement) 200 cy; removal of existing drainage structure 2 ea; removal of existing drainage pipe 20 lf; selected fill 410 cy; 14" ductile iron pipe 123 lf; 16" ductile iron pipe 67 lf; 18" ductile iron pipe 54 lf; cleaning existing drainage pipes 206 lf; cleaning existing drainage structures 10 lf; 18" hdpe high-density smooth interior corrugated pipe 40 lf; 24" hdpe high-density smooth interior corrugated pipe 690 lf. See outside link.
Louisville-Jefferson County Metro Sewer District
This project includes drainage improvement. Work includes 1400 LF 10" pipe installation, 39 EA 18" x 18" cach basin installation, 900 sy concrete driveway apron replacement, 9 EA catch basin tie-in connections, 3 EA modifying catch basin grate elevations, 30 LF sidwealk replacement, 145 LF earthen regrade, 21 EA gas service relocation, 21 EA water service relocatioin, tree removal. See attached file.
Township of Bloomingdale
Drainage improvement.
City of Avondale
Work includes 14,050 CY basin 1 sediment removal, disposal and compaction; 9,300 CY basin 2 sediment removal, disposal and compaction; 18,575 CY basin 3 sediment removal, disposal and compaction; 11,575 CY basin 4 sediment removal, disposal and compaction.
Release
Sep 04, 2025
Close
Nov 06, 2025