Retrieving RFP details
Release
Close
City of Pompano Beach
Well rehabilitation and maintenance services.
City of San Bruno
Public Works Department, is requesting proposals to provide scheduled well rehabilitation, preventative mechanical maintenance, and emergency repairs to the City’s water wells, pump stations, and related facilities. The Contractor must be able to respond to emergency repairs within 24 hours and within 48 hours for non-emergency repairs. Primary work includes, but is not limited to, all labor and equipment to repair, replace, adjust, and maintain pumps, motors, and related mechanical systems; inspect, repair, and replace media filters; pull and inspect wire cable/power supply; video inspection; testing; and emergency response.
Town of Parkton
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
Ventura County Waterworks District #1
Well rehabilitation. Installation, testing and coordination of a deep well vertical turbine pump for municipal water service. Conduct a high pressure jetting operation throughout the well screen with the proprietary construction process known as WellJet® (US Patent No. 8,312,930 81).
Release
Oct 16, 2025
Close
Nov 19, 2025