Retrieving RFP details
Release
Close
City of Monterey
Work consist of 5,790 SF of remove concrete curb and gutter, sidewalk, curb ramp, sidewalk crossing, and driveway, 2 EA of salvage parking meter, 41,000 SF of remove ac pavement and base, 150 SF of remove ac dike, 1,300 SF of salvage and reinstall aggregate walkway, 2 EA of reconstruct storm drain inlet (precast curb opening EA), 6 EA of reconstruct storm drain inlet (combination inlet), 15 EA of adjust valve cover to grade, 2 EA of adjust utility box to grade, 2 EA of adjust flushing inlet to grade, 2 EA of adjust manhole cover to grade, 1 EA of replace manhole cone and adjust cover to grade, 2 EA of reinstall wheel stop. See attache file.
Wave Street Curb Ramp Improvement Project (35c1555)
zip
Town of Robersonville
Work includes 18,900 sy of full depth roadway replacement, manhole ring adjustments, valve box adjustments, remove and replace exiting valley gutter, remove and replace existing curb and gutter, undercut.
Illinois Department of Transportation
Work includes 13,713' longitudinal joint sealant; 218 SY hot-mix asphalt surface removal - butt joint; 86 ton hot-mix asphalt replacement over patches; 415 SY protective coat; 1,320 SF portland cement concrete sidewalk 5"; 380 SY hot-mix asphalt removal over patches, 4"; 5 SY class D patches, type I, 9"; 262 SY class D patches, type II, 9"; 40 SY class D patches, type III, 9"; 765 SF concrete median surface, 4"; 170' pipe culverts to be cleaned 12"; 500' pipe culverts to be cleaned 24"; 642' electric cable in conduit, signal no. 14 2C; 656' electric cable in conduit, signal no. 14 3C
City of Manteca
Work consists of bike and pedestrian improvement project, work includes the installation of rectangular rapid flashing beacons, bike lanes, curb ramps, and pedestrian crossing enhancements, slurry seal, striping, pavement markings, and signage.
Release
Oct 14, 2025
Close
Nov 11, 2025