Rancho California Water District
Project is to rebuild one of our waukesha gas engines that drives a right-angle gearbox that in turn drives a pump. work include: contractor will be responsible for removing, transporting and installing the Waukesha engine as part of the rebuild process. RCWD staff will make accommodations to allow contractor staff access to the site as needed; Main bearing replacement with a sleeve kit; Connecting rod bearings; Oil pump replacement; Main and auxiliary water pump rebuild; Any needed machining to correct alignment or wea
Release
Nov 05, 2024
Close
Dec 05, 2024