City of Fairfield
Work consist of removal and replacement of all five high lift vertical turbine pumps, pump discharge silent check valves, air release valves, butterfly valves/motor operators, pump 1 and 2 discharge piping upsize modifications, removal and replacement of black vinyl coated chain link fence and gate; sawcutting and removals of existing PCC concrete pavement and curbs, new 8 inch wide curb under portion of new fence, replacement of wet well access hatch with a larger custom combined access hatch and vent/overflow aluminum hatch, patching AC pavement along new conduit trenches to the Zone 3 pump station, removal and disposal of the old Zone 3 pump station’s abandoned 12" suction water piping; see outside link.
Release
Aug 16, 2024
Close
Sep 17, 2024